Starting under what severity level should we push back on the change action?
What is severity 1 and 2
Included in MB5B inventory calculation
What is blocked stock
I am the reason why we need a bank build
What is tool modification or resourcing
None-useable stock post change. What is our action?
What is OMRB
This Jira project manages the resourcing activities and discussions.
What is CMI
What should be the source of truth for production volumes when planning a change?
What is POM1
Use this code to view the BOM for plastics, body, sub assemblies, fastener collectors.
True or False- ECM must validate that demand has been cut off to the old supplier
False
This application will replace required OBOM validations for R2.
What is MARS
Changes to the MPL
What is RBCM
Required to successfully update the BOM from an MCA approval.
What is P1 Status
Variables for dynamic safety stock
What is daily average requirements multiplied days on hand.
A tool move under the same supplier but to a new location?
What is SREA
A written document that releases temporary solutions into production.
What is deviation
Tool downtime, PPAP timing, forecast MPP changes, quality fallout rate at GA, EOL, and supplier, and service requirements are the responsibilities of ECM when supporting this activity.
What a supplier resourcing
Material ready time, dimensions, weight, number of pallets and ship from location
What is expedite quote
This T code can be used to be find the parts list per VIN.
What is ZPP_OBOM_VAL
Once resourcing has started this document will require ECM approval.
What is termination letter
Does not a require a CA release to kick off discussions
What is resourcing
On average what percentage of data is missing from SAP OBOM to MES that requires our team to run validations?
What is 30%
Before approving this type of change, the approver must confirm that all impacted stakeholders are aligned to the change and content is under the same CR.
What is coordinated change
This access node is used for R1 Gen 1 products
What is AN_R1T_PPSOP
This percentage must be factored in bank requirements to consider fallout and delays
What is buffer
In the PD application for protype master data, this column should be used to determine quantity requirements for PV and MVB.
Build QTY/ Build QTY to order (whatever is higher)
What program specific suppliers are not included in EKanban
What is DCFC/ EDV