Week 1
Week 2
Week 3
Potpourri
Lean Leader Instructors
100
This Continuous Improvement methodology aligns to the A3 process
What is the PDCA cycle
100
Time Available divided by Customer Demand represents this metric
What is "Takt Time"
100
Availability X Performance X Quality is the equation for this metric
What is Overall Equipment Effectivity
100
We built construction vehicles using these childhood toys
What is "Legos"
100
Value Stream Mapping
Who is Sal Santangelo
200
In the movie "The Goal", this character's name represented the bottleneck contraint
Who is Herbie
200
This type of indicator predicts future events and tend to change ahead of that event.
What is a Leading Indicator
200
This type of Set Up is defined when the activities that must be performed occur while the machine is shut down
What is Internal Set Up
200
These were the names of the 2 delivery units visited during Week 2
What is McLean and Fairfax
200
Lean Management System
Who is Doug Sunshine
300
This was the theme of our first week
What is "Learning to See"
300
A common name for the Standard Work Sheet refers to this cuisine
What is a Spaghetti Chart
300
A trend of larger and larger swings in inventory in response to changes in customer demand is known as this
What is the Bullwhip effect
300
These were the 4 materials given to each group during the Marshmallow challenge
What is Marshmallow, String, Tape and Spaghetti
300
Bottlecap Simulation
Who is Kevin Kieran
400
These were 2 USPS VPs that visited our class during Week 1
What is Jim Nemec, Kristin Seaver, Maura McNerney
400
He famously said "You can't manage what you can't measure"
Who is W. Edwards Deming
400
Information travels downstream in this type of system
What is Push system
400
The former was the name of the company that managed the Bolger Center during Week 1 of our training and the latter is the name of the company that currently manages the Bolger Center
What is Dolce and Aramark
400
Visual Management
Sal Santangelo
500
This was the date on the Monday of the 1st week
What is "October 27th"
500
A process is said to be in this state when all special causes of variation have been removed and only common causes remain
What is Statistical Control
500
In Set Up Reduction, the F.A.S.T. acronym stands for these concepts
What is F (Foresight) A (Attach & Detach) S (Setting Conditions) T (Trial Runs and Adjustments)
500
Listed in order, these were the buildings we were in for each of our training weeks
What is Franklin, Osgood, Franklin, Osgood
500
Statistical Process Control
Mike O'Connell