Complete copy of a project plan that compares to the current schedule to evaluate progress.
What is a Baseline
100
OTD = _______
What is On Time Delivery
100
Three equal vertical stripes - the left is blue, middle is white, right is red. Based on a cockade worn by King Louis XVI while addressing a revolutionary gathering in Paris.
What is France
100
Employees enter actual hours expended into their timesheet here
What is P6 Progress Reporter
100
Develops core products and generic systems to maintain the product portfolio in line with RCS Product Strategy and Roadmaps and the requirements of applicable industry standards.
What is EAPD
200
This key is pressed in Primavera Client to 'Calculate' the schedule?
What is F9
200
PCC represents
What is Planning Competence Center
200
A white base with a blue cross representing the blue of their lakes and the white snow of their Northern European winters.
What is Finland
200
Can be used to identify areas of overload in Role Usage Profile charts
What is a Role Limit
200
Train to wayside communication occurs through a __________ system
What is Radio
300
Allows a user to copy a project, make changes to it and then merge selected changes back into the source project.
What is a Reflection
300
BIP represents ________
What is Bombardier Integrated Planning
300
2 horizontal halves - top is white (peace) & bottom is red (blood shed in fight for independence) which was adopted in 1990. Colors based on national coat of arms which is a white eagle on a red shield and dates back to 13th century.
What is Poland
300
Number of units available during each workperiod (hour, day, week, or month) of the specified timeframe; Entered as a %, or a number with the appropriate time unit (such as 8h)and/or duration unit (such as 8h/d), depending on your user preference setting for time and duration units.
What is Max Units/Time
300
Responsible for Concept Design Paper, Requirements Management, System Level Requirements and Design Specification, System Design Specification, System Architecture
What is a System Engineer
400
Organizes and summarizes all projects within the enterprise hierarchically for top-down budgeting, resource / cost analysis, and global control of data. Can manage multiple projects from the highest levels of the organization to the individuals that perform specific project tasks.
What is the Enterprise Project Structure
400
BUBT represents _________
What is Bottom-Up Budgeting Tool
400
5 horizontal stripes. Top & bottom are equal-sized red stripes (blood spilt for independence), the middle stripe is blue (national color) which is lined above and below by equal-sized white stripes (Buddhism). In Asia.
What is Thailand
400
This view can analyze labor hour usage for resources or roles. For every role and resource in the project, labor hour information for a specific project or for all projects across the enterprise (total allocation) can be reviewed.
What is a Resource Usage Spreadsheet
400
Product Line for ‘Semi-Automatic Train Operation’ used for Light Rail or Metros
What is CITYFLO350 or CITYFLO450
500
Provides a way to break activities down into smaller units and track the completion of those units. Can track progress on an activity using weighted values.
What are Activity Steps
500
CAA = _______
What is Central Applied Actuals
500
3 horizontal stripes. Top & bottom are equal-sized red stripes, middle is yellow double the size of the red stripes. In the left side of the yellow stripe is the country's coat of arms with a crowned shield, quartered & guarded on each side by the crowned Pillars of Hercules - representing Gibraltar and Cueta.
What is Spain
500
Profile that can be assigned to any resource or role assignment on activities with a duration type of Fixed Duration and Units/Time or Fixed Duration & Units. Resource usage is distributed evenly during an activity unless you specify this function.
What is a Resource Distribution Curve
500
Number of years Rail Control Solutions has been in existence