This type of development causes increased transportation impacts on the environment because development of this type segregates land into different types of uses.
What is traditional commercial development
100
Poor execution of sustainability requirements on a project is often the result of
What is poor communication between all parties
100
On-site fabrication of building components leads to
What is increases in overall waste on a project
100
This can aid in a decrease in air emissions from diesel combustion
What is the use of biodiesel mixtures to run heavy equipment
100
With respect to commissioning plans, this is a key contractor submittal often required on green projects
What is a commissioning milestone schedule
200
The less disturbed the construction site is, the betterʺ this is true for all sites except this kind.
What is a brownfield site
200
Waste hauling and disposal activities are part of the documentation required for this LEED credit.
What is MR Credit 2: Construction Waste Management
200
This is an important consideration involving the claims associated with a green product when using an online or print database
What is third-party verification of the claims
200
It is important to evaluate prior to substitution the impact that a product substitution may have on these.
What are LEED credits
200
With respect to sustainable projects, a major role of the construction team is to build the design and to do this.
What is manage and track documentation
300
Construction impacts outside of a construction site boundary are primarily caused by this
What are imports and exports of materials and waste across the site boundary
300
The record keeping required to qualify for EQ Credit 4: Low-Emitting Materials includes all VOC-emitting
products and this.
What is the emission levels of these products
300
A reason why the procurement of products for use on green projects requires additional attention is because of
this.
What are new product documentation requirements
300
During the post-construction phase of sustainable projects, owners and operators are responsible for operating and maintaining the building according to this.
What is preconstruction goals
300
An overall waste management schedule should be a part of the construction waste management plan if the
intent is this
What is separate the waste materials on-site
400
Construction vehicles and heavy equipment damage soil by this.
What is compacting it
400
Designing and maintaining site operations during construction to minimize damage to the site is related to
this sustainable site credit
What is Site development — Protect or Restore Habitat
400
All of the emissions produced during the manufacturing of a product are tracked in this.
What is the life cycle analysis
400
According to this acronym, effective project objectives should be measurable and time-bound
What is SMART
400
With respect to sustainable projects, planners, developers, and owners play a direct role in determining these goals of the project
What are green goals
500
With respect to excess materials, sustainable construction projects should prevent pollution by doing this.
What is not ordering more material than necessary
500
Regenerative construction practices go beyond minimum sustainability by doing this.
What is creating and restoring ecosystems
500
All new wood and wood-based products used on the project must be listed to calculate this credit.
What is MR Credit 7: Certified Wood
500
As part of the cost/benefit analysis completed for a waste management plan, a sustainable construction
supervisor should consider this
What is the likelihood of meeting project waste diversion goals
500
The most successful green projects involve these stakeholders during the initial stages of design and planning?