Entergy
Tickets
Overhead
Underground
Random
100

What is the name of Entergys CEO?

Bonus Points: Where did he attend Undergraduate and Graduate?

Drew Marsh

Undergraduate: Notre Dame

Graduate: Northwestern

100

What type of ticket is an IN/D?

Design

100

What is the maximum distance for a 1ph 100amp overhead service with A4T wire?

100'

100

What is the minimum conduit size for 500QU?

4"

100

Who is the best selling artist/band of all time?

The Beatles

200

What is the company's motto or catchphrase?

We Power Life

200

What type of ticket is an MCON?

Miscellaneous Construction

200

A pole is to have a horizontal loading of ____ or less to meet Entergys resiliency standard?

85%

200

How much is an overhead to underground service conversion when no design is required?

$250

200

What is the name of the Damage Assessment App that you use on your phone?

Field Maps

300

What are the 5 Entergy OptCo's?

Arkansas, Louisiana, Mississippi, New Orleans & Texas
300

What three numbers do new accounts currently start with? (After the 000)

207

300

What type of primary framing is called for when using the number 8 in the CU?

DDE

300

What are the required minimum conduit schedules for the scenarios below?

Above Ground

Below Ground

80

40

300

What is your body's largest organ?

Skin

400

Although it was not called Entergy, how far back can you trace the companies roots?

1913

400

What type of ticket is a CCTD?

Complaint

400

What does IPO stand for?

Independent Phase Operated

400

What is the size of the smallest pullbox we use?

30"Wx60"L48"H

400

What book does Forrest Gump keep in his suitcase?

Curious George

500

What was the original fuel used to generate power?

Sawdust

500

How long do you have to make contact and note account after ticket has been assigned?

48hrs

500

What is one of the four scenarios a customer may have two separate meter locations on one building?

Fire pumps, Emergency systems, and legally required standby systems (which shall be allowed sperate additional service drops)

Different Characteristics (voltages, or phases, or for different uses, such as for different rate schedule which may be allowed additional service drops)

Very large services (>2000 amps may also qualify for an additional service drop)

Apartment buildings or multiple service buildings (shall have the service grouped at a single company approved location.  The exception is where a maximum two areas are separated by a firewall and then a second service drop in a different company approved area may be permitted)

500

A minimum of ____ feet clearance shall be provided at the front of the transformer slab?

12

500

What is the total surface area of the Great Lakes combined? (closest number wins points)

94,250 square miles