This is the percentage that ENT accounts for automotive work.
What is 60%?
What size should part data holes be pierced?
.002" under maximum
This is the first thing that you do when starting fresh on a job.
What is deburr and blow out all chips from the die shoes?
This is the first thing that is done when a die is starting the tryout process.
What is referencing the die book and consulting with the assembly dept?
This golfer is known for his iconic red shirt on Sunday
Who is Tiger Woods?
What bimonthly cleaning events do we hold, where the name of the event is loosely translated from Japanese, meaning "change for the good"?
Kaizen Events
What is the standard for drop through steps from die steel to riser and riser to die shoe?
1/4"
All details must have this BEFORE mounting on the die shoe.
What is identification?
This is the fluid that is put onto parts to show the die maker how the die is hitting.
What is spotting blue?
These 2 teams played in the 2025 World Series
Who are the LA Dodgers and Toronto Bluejays?
What is the tonnage of our largest press?
800 Tons
Clearance for punches in pads should be what percentage of material thickness?
75%
This is what must be on the tool to complete the full dry run.
What is everything? (guards, chutes, all details, and parallels)
This is what a finished part off the end of a die gets checked on.
This NBA franchise has won the most championships
Who are the Boston Celtics?
What is the bed size of our SMALLEST press? (length and width, ±5" allowance each direction)
40" x 60"
What is the minimum depth for a counter bore?
All counter bore must sink the entire screw head below the surface
This must be filled out completely before the die can start tryout.
What is the die book and die check off sheet?
This is where a form change is to be done at. (station)
What is the station that is putting in the feature?
This franchise was the first to win 6 super bowls
What is the machining travel capability of the AWEA CNC machine? (length and width; ±10" allowance each direction)
158" x 94"
Carrier flanges should be formed over lower post having what geometry?
Square lower form, no radius on inside of part
This is when the final bolt check signature gets signed at the bottom of assembly guidelines.
What is after all tryout is done and die is getting ready for TSRO/Post Mortem?
This is what is done to pierce and cam stations after all forms are hitting thru.
What is panel spot?
This university has produced the most #1 overall NFL draft picks
What is the University of Southern California (USC)