Vehicle maintenance and refueling activities may not be conducted at sites with this permit type.
What is No - Exposure Certification (NEC)?
This term describes the location where wastes are stored before vendor pickup, and must comply with local fire and building codes.
What is Central Accumulation Area (CAA)?
All hazardous materials must be transferred from the PAD area throughout the day but at a minimum of this frequency.
What is 24 hours/ once a day?
This term is used for a document required if your site is MSGP, often called a SWPPP.
What is a Stormwater Pollution Prevention Plan?
This label pictogram
indicate hazard class
or division of hazmat
in a package
What are DOT Labels?
These packages are to be double bagged and taken immediately to the CAA for processing.
What are leaking packages?
This permit type allows fleet services at the site.
What is Multi-Sector General Permit?
These containers are used to contain liquid waste, and are prepared for use with a double liner and absorbent pad
What is a Cubic Yard Box (CYB)?
These are used to control and clean up accidental
spills
What are absorbent pad/spill pads?
This mechanism is used to verify spill kit inventory in the trailer yard.
What are Monthly Spill Kit Inspections?
This hazardous waste is known as “commonly and universally” generated by a wide variety of businesses.
What is Universal Waste?
A process that allows amazon to give to communities and reduce waste generation.
What are Donations?
This training is required to complete yard activities.
What is Yard Safety Training?
This generator status requires the maximum amount of hazardous waste in a calendar month to be 2200 lbs.
What is A Small Quantity Generator Status (SQG)?
Use this tool to report potential DSP deviations.
What is Field Escalation Protocol?