This visual cycle, shaped like a specific letter of the alphabet, guides the Planning Section through a structured sequence of meetings.

The Planning "P"

100

Upon arriving at your desk, you open this form to maintain a running record of your actions and decisions. What is the form called (number or name)? 

EOC 214 Activity Log

100

The Situation Unit builds Form EOC 209, an official snapshot of the disaster known as the SITREP, which stands for ________ Report.

Situation

100

The Damage Unit collects Red, Yellow, and Green structural safety tag counts directly from the Ops Section branch focused on Building & ________.

Safety

100

While Operations focuses on the current shift, the Advanced Planning Unit forecasts problems and resource gaps this specific timeframe into the future: _____ to 72 hours.

36 hours

200

To stop rumors, the Vetting Policy requires you to verify information with at least this many independent sources, known as the "Rule of ____"

Two

200

The Planning Section Coordinator (PSC) publishes Form EOC 230 so everyone knows when the Strategy and Planning meetings occur. Form 230 is titled the Daily ________ Schedule.

Meeting

200

The baseline map created by GIS ensures everyone shares the COP, which stands for the Common Operating ________.

Picture

200

The Damage Unit compiles the IDE spreadsheet to secure financial aid from the state. "IDE" stands for Initial Damage ________

Estimate

200

The Demobilization Unit prepares the official release strategy using Form EOC 221, titled the ________ Plan.

Demobilization

300

The entire Planning "P" cycle exists to produce the EAP packet for the next operational period. "EAP" stands for the EOC Action ______.

Plan

300

The Resource Unit uses Form EOC 211 to track who has arrived for their shift. Form 211 is also called the ________ / ________ form.

Check-in/Check-out form

300

If information is completely unverified, SITSTAT keeps it off the main display and logs it in an Internal ________ Log.

Rumor

300

To prevent double-counting a flooded water plant in the IDE, you must cross-check data between Building & Safety and which other Branch in the Operations Section?

Public Works Branch

300

When floodwaters recede, it serves as one of these "T" words—a specific milestone that signals it is time to transition to recovery.

Trigger or Threshold

400

The EEI Checklist tells the Situation Unit what critical data to hunt down. "EEI" stands for Essential ________ of Information.

Elements

400

The EOC Director's priorities for the next shift are recorded on Form EOC 202 which is collected by the Planning Section, this document which is titled Incident ________ form.

Incident Objectives

400

GIS must format evacuation maps so Law Enforcement can share them immediately with the County so they can be used in the public warning system, known as VC ________.

Alert

400

When the Document Unit merges the EAP spreadsheet and all PDF attachments into a single, un-editable file, it is called doing this to the document

Flattening

400

Demob prioritizes releasing the most recent mutual aid arrivals first, following the LIFO acronym, which stands for Last-In, First-_____.

Out

500

The Planning "P" cycle includes two major meetings to build the EAP. The first is the Strategy Meeting, and the second is the ________ Meeting.

Planning

500

Form EOC 203 assigns a specific person to each EOC position. It is called the Organization ________ List.

Assignment

500

To ensure map PDFs merge in the right order (like "2b_COPMap"), the GIS Unit must add a standardized ________ to the beginning of the file name.

Prefix

500

Name two of the EOC Forms that are collected by the Document Unit to build the EAP?

  • EOC 202: Incident Objectives   

  • EOC 203: Organization Assignment List   

  • EOC 205A: Communications List   

  • EOC 207: Organization Chart   

  • EOC 208: Safety Message   

  • EOC 230: Daily Meeting Schedule  

They also collect non-form attachments such as the verified Incident Summary from the Situation Unit and the updated GIS Situation Map.


500

Before Demob lets someone leave the EOC, the person must submit their final Form EOC 214, also known as the ________ Log, to the Document Unit.

Activity