Dose Assessment
ERO Expectations/ERO Changes
Fukushima
DEP and Drill Lessons Learned/OE
Random
100
Since January 2016, INPO has issued this number of AFI's to the industry for dose assessment?
What is five?
100
This document has recently been updated with new conference call phone numbers
What is EP-RM-007?
100
The events of Fukushima occurred on this date.
What is March 11, 2011
100
Over the last year (from July 1, 2016 through July 31, 2017) this is Susquehanna's DEP percentage?
What is 99.1%?
100
These ERO positions have recently been eliminated.
What are the TSC Lead Engineer, OSC Engineer, and General Office Support Engineer?
200
These are the potential results of a weak dose assessment program during an actual event.
What is Inaccurate emergency event classifications and inappropriate protective actions?
200
This information is listed on the handset of the Avaya phone?
What are the dialing directions on how to dial CTN to CTN and to external phone numbers?
200
This Phase of the mitigating strategies involves installed FLEX equipment, portable Equipment and Partial ERO Staffing.
What is Phase 2 of the Mitigating Strategies?
200
These are two of the Lessons Learned out of the Federally Evalluated Biennial Exercise:
What are: PA announcements not made for all EAL declarations Information not provided to Control Room TSC/OSC never established 24 hour staffing OSC not aggressive in ensuring critical missions completed with a sense of urgency (teams not dispatched within 20 minutes) Multiple errors made in Dose Assessment Calculations
200
These are thetwo DEP failures that occurred in the last year.
What are: 2nd PAR not developed due to confusion over Dose Assessment results/PARs beyond 10 miles during the 6/6/2017 White Team Drill Biennial NRC Exercise – Incorrect Dose Assessment caused a controller inject to provide expected scenario conditions – PAR was considered a failure due to the controller inject (correct PAR was determined by the EOF however)?
300
These are the 4 Risk Signficant Planning Standards affected by Dose Assessment
What are Emergency Classification, Notification Methods and Procedures, Accident Assessment, and Protective Response?
300
These positions have been made "all-call" positions
What is the JIC Technical Briefer and JIC News Manager
300
This procedure provides instructions for Deployment of Flex generators, fuel transfer strategy, and connection to RHRSW.
What is Deployment, DC-FLEX-003
300
During the event at Quad Cities, ERO personnel were unfamiliar with the termination process. At Susqheanna, this procedure covers the Termination process.
What is EP-00-003?
300
If you are not on-call and the NXT system asks you to enter your response time, this is your responsibility?
What is respond to your assigned facility to fill the back-up role for your position?
400
These calculations are more conservative. (choose between Monitored or Unmonitored)
What are Unmonitored?
400
These are the required responsibilities for all ERO members when going on-call.
What are: Carry pager and badge/company ID Attend 0730 Friday Muster Meeting Ensure pager battery is fully charged Review EP-PS procedure Respond to monthly pager tests?
400
This NRC Rulemaking addresses multiple ongoing Post-Fukushima actions.
What is MBDBR Rulemaking 50.155?
400
This was the impact of not communicating the vital information that the Blowout Panel lifted during the June 2017 ERO Drill?
What is a delay in depressurization of the Reactor, leading to a longer duration and greater magnitude release to the public?
400
This is how the following affect the radiological release in terms of dose assessment. Reactor Power Reactor shutdown time Fuel Damage
What is: As reactor power increases, radioactivity increases, The longer the time since shutdown, the less radioactivity, The greater the amount of fuel damage, the greater the amount of radioactivity?
500
These factors can reduce the release rate of a radiological release.
What are Filtered Release Pathway, Containment Spraying Scrubbing via the Suppression Pool, Hold Up Times in Primary and Secondary Containment.
500
SCENARIO: The Control Room made an initial declaration of a FA1.1 (Alert) at 0830. This is the time is the EOF required to take command and control of the emergency?
What is the EOF is not required to take command and control? In this scenario, the EOF is not required to take command and control. The EOF does not have to assume command and control until 90 minutes after the declaration of a Site Area Emergency.
500
The Final Rulemaking for Fukushima response must be implemented by this year.
What is 2019?
500
Based on the events from Quad Cities, when your pager is activated, you should NOT take this action.
What is call the Control Room and ask questions? It is a distraction to the Control Room who are mitigating the effects of the emergency.
500
These are the colors of the three Susquehanna ERO teams.
What is White, Blue, and Gold?