Systems
Controlled Devices I
Controlled Devices II
SCADA
Safety
100

What does EPMS stand for?

Electrical Power Monitoring System.

100

True/False: One House Mechanical Distribution (HMD) can control a whole data hall.

False

100

What communication protocol is used for the electrical equipment?

Modbus

100

What level alert does the color PURPLE represent in SCADA?

Level 3 Alert, manual operation alert, and more.

100

How many steps are required to complete an OSHA APPROVED LOTO?

8
200

What does the acronym PTX stand for?

Pad Mounted Transformer

200

What is the goal of an Electrical Generator (EG)

The goal of the generators is not to keep the data halls fully up and running, but more so to maintain the core operation so that when utilities come back online the site is able to experience a seamless transition back into utility power and can get the building back up and running.

200

What is the primary function of the Main Switch Gear? (MSG)

The primary function of the MSG is to have a step down in voltage.

200

What color will OPEN breakers on a oneline in SCADA be?

Green

200

If it is then end of the day, can you take someone's LOTO off a device?

NO

300

Name the devices ThermoSystems can manually control through SCADA.

None/NA

300

Does ThermoSystems monitor junction boxes in SCADA?

No

300

What is the function of the Motor Operated Air Breaker (MOAB)? 

The MOAB is a breaker that will connect the utility feeds into the substation equipment and feed power into the rest of the site.

300

What color will CLOSED energized breakers on a oneline be in SCADA?

Red

300

What trades should be notified that are working in an area with a LOTO?

ALL OF THEM

400

Name all 5 of the statuses a breaker can have (Excluding dither/comms loss)

Tripped, Racked in, Racked out, Closed, Open

400

What is the main function of an Uninterruptable Power Source (UPS)?

Uninterruptable Power Source (UPS) is used to make sure that the generators can turn on during loss of utility.

400

How many RPP's are in each building?

192

400

What color box will be around a point you can manually change in SCADA?

White

400

How many keys are able to open a unique lock for a LOTO?

1

500

In a Gen Yard, power is taken from a utility feed at how many kV before stepping it down for the building?

138kV

500

How many Automatic Transfer Switches (ATS's) are in a data hall? 

12

500

What unit is used to transfer power into the “Switch Rack” of the Building Distribution Frames (BDF) 

Power Distribution Units (PDU)

500

What do the letters CT represent in SCADA's graphics?

Conductivity

500

What OSHA section covers control of hazardous energy?

The OSHA standard for The Control of Hazardous Energy (Lockout/Tagout), Title 29 Code of Federal Regulations (CFR) Part 1910.147