100

The OER has ________ Game Changer Themes

a) 7  

b) 5

c) 6

d) 3 

A) 7

100

Mention 5 of the 12 Life saving rules.

Valid Work Permit;   Conduct gas tests;  Verify Isolation;   Confined space; Over-riding SCE; Working at height; Suspended load;   Smoking areas;    No alcohol/drugs while working/driving;   Do not use phones while driving;  Use Seat belts; Journey mgt.

100

SPDC's 2018 Fit for the Future ambition is described in 3 numbers. What are the numbers?


“1-0-1”

100

Shell is the operator of a Joint Venture agreement involving NNPC, Total, Agip and Chevron. 

True OR False.

False

200

Mention 3 of the 7 Winning Ways of Working.

Safety/Goal Zero,  Compliance,   

Integrated Delivery,  Continuous Improvement,    

Commercial Acumen, External Alignment, 

Cost Ownership

200

Mention the 3 HSE golden rules.

Compliance, Intervention, Respect our neighbours

200

What is the full meaning of the abbreviation - FPSO? A. Floating, Production, Storage and Offloading 

B. Fundamental, Petroleum, Sailing, Opportunity 

C. Freedom, People, Staff and Organisation  

D. Free-Flow, Production, Supply and Oil

A. Floating, Production, Storage and Offloading

200

E&C - If I'm invited to speak at a conference on a topic related to my work at Shell. There is no E&C issue if I request for travel allowance, payment or gifts from the organisers.

TRUE / FALSE


FALSE

In general, external speaking opportunities should be work-related and bring mutual benefits to Shell as well as the organiser. Speaking opportunities should therefore be considered as part of your role and Shell should take up all costs, including travel and accommodation.

300

The ______ makes all documents in SCiN visible across the whole organisation

a) SharePoint

b) BI Portal

c) Wave 

a) SharePoint

300

What is the new general emergency number?

a) 180 , 

b) 199  

c) 222

d) 991 

b) 199  

300

Mention 3 of the SCiN cost saving rules.


1] Start with Minimum Functional Specification; 2]Challenge Project specifications, Scope & Price. Establish “Should Cost” 3] Define projects and activities with ‘Cost’ as Key Value Driver; 4] Apply Lean Assurance, fit for project size or complexity; 5] Own your Activities, Projects and Contracts; 6]Work within Approved Budget; 7] Secure Approval before Commitment; 8]Think Cost in Naira; 9]Demobilize Idle Resources; 10] Use In-house Resources and Experience as Default; 11] Avoid Non-Value Add Exposure; 12] Always optimize and share resources

300

E&C - Do I need Line Manager approval to refuse G&H offered to me? 

YES / NO 

NO

400

Mention 3 of 7 Game Changer Themes of OER

1. Wider Implementation of SBOs 2. Fast-Track High Impact Technologies 3. More Effective In/Outsourcing 4. Eliminate Value Eroding Practices 5. Reduce & High-Grade Infrastructure Footprint 6. More Efficient External Interfaces 7. Simplified Structure & Inspired People

400

When was the 2018 Oloma Remembrance Day

a) Nov 12

b) Nov 20

c) Nov 22

c) Nov 22

400

What is full meaning of GMOU?


Global Memorandum of Understanding

400

E&C -  ______ condition should necessitate inclusion of ABC Clauses except:

A] New contract;  

B] Renegotiation of a contract not containing ABC clauses; 

C] 3 years has elapsed since the signing of original contract not containing ABC clauses; 

D] White flags have been discovered on the counter party. 


D] White flags have been discovered on the counter party. 

There is nothing like White Flags, the correct answer is Red Flags