The OER has ________ Game Changer Themes
a) 7
b) 5
c) 6
d) 3
A) 7
Mention 5 of the 12 Life saving rules.
Valid Work Permit; Conduct gas tests; Verify Isolation; Confined space; Over-riding SCE; Working at height; Suspended load; Smoking areas; No alcohol/drugs while working/driving; Do not use phones while driving; Use Seat belts; Journey mgt.
SPDC's 2018 Fit for the Future ambition is described in 3 numbers. What are the numbers?
“1-0-1”
Shell is the operator of a Joint Venture agreement involving NNPC, Total, Agip and Chevron.
True OR False.
False
Mention 3 of the 7 Winning Ways of Working.
Safety/Goal Zero, Compliance,
Integrated Delivery, Continuous Improvement,
Commercial Acumen, External Alignment,
Cost Ownership
Mention the 3 HSE golden rules.
Compliance, Intervention, Respect our neighbours
What is the full meaning of the abbreviation - FPSO? A. Floating, Production, Storage and Offloading
B. Fundamental, Petroleum, Sailing, Opportunity
C. Freedom, People, Staff and Organisation
D. Free-Flow, Production, Supply and Oil
A. Floating, Production, Storage and Offloading
E&C - If I'm invited to speak at a conference on a topic related to my work at Shell. There is no E&C issue if I request for travel allowance, payment or gifts from the organisers.
TRUE / FALSE
FALSE
In general, external speaking opportunities should be work-related and bring mutual benefits to Shell as well as the organiser. Speaking opportunities should therefore be considered as part of your role and Shell should take up all costs, including travel and accommodation.
The ______ makes all documents in SCiN visible across the whole organisation
a) SharePoint
b) BI Portal
c) Wave
a) SharePoint
What is the new general emergency number?
a) 180 ,
b) 199
c) 222
d) 991
b) 199
Mention 3 of the SCiN cost saving rules.
1] Start with Minimum Functional Specification; 2]Challenge Project specifications, Scope & Price. Establish “Should Cost” 3] Define projects and activities with ‘Cost’ as Key Value Driver; 4] Apply Lean Assurance, fit for project size or complexity; 5] Own your Activities, Projects and Contracts; 6]Work within Approved Budget; 7] Secure Approval before Commitment; 8]Think Cost in Naira; 9]Demobilize Idle Resources; 10] Use In-house Resources and Experience as Default; 11] Avoid Non-Value Add Exposure; 12] Always optimize and share resources
E&C - Do I need Line Manager approval to refuse G&H offered to me?
YES / NO
NO
Mention 3 of 7 Game Changer Themes of OER
1. Wider Implementation of SBOs 2. Fast-Track High Impact Technologies 3. More Effective In/Outsourcing 4. Eliminate Value Eroding Practices 5. Reduce & High-Grade Infrastructure Footprint 6. More Efficient External Interfaces 7. Simplified Structure & Inspired People
When was the 2018 Oloma Remembrance Day
a) Nov 12
b) Nov 20
c) Nov 22
c) Nov 22
What is full meaning of GMOU?
Global Memorandum of Understanding
E&C - ______ condition should necessitate inclusion of ABC Clauses except:
A] New contract;
B] Renegotiation of a contract not containing ABC clauses;
C] 3 years has elapsed since the signing of original contract not containing ABC clauses;
D] White flags have been discovered on the counter party.
D] White flags have been discovered on the counter party.
There is nothing like White Flags, the correct answer is Red Flags