Vocab 1
Vocab 2
People you should know
Assignments
Divisons
100

PVR

Potential Vertical Rise 

100

PI

Plasticity Index


100

15 years in the industry
Family (Married 10 years, 3 children)
Director of Estimating – Noble Texas Builders

Steven Delgado 

100

This assignment taught you what contour lines are

Assignment #02 - Franklin Business Park Grading Plan 

100

Concrete

03

200

If additional reinforcing steel is not an option for concrete tilt wall panels with openings, _______are used to stiffen the panel.

Strong Backs


200

_____________ is used to prevent the concrete wall panel from adhering to its’ casting area surface.

Form Release

200

When youre not sure when you'll graduate, go to this guy to find out

Wesley Swanson

200

This assignment taught you what it meant to be a true aggie

Service Assignment 

200

Openings - Doors, Windows 

08

300

Which of the following is a drawing or information that modifies the basic contract documents after they have been issued to the bidder providing clarification, correction, or changes in the other documents?

Addenda

300

 Which of the following types of estimates takes the least amount of time to complete but is also the least accurate?

Project Comparison

300

Industry Relations Coordinator

This guy will help you get internships 

 Senior Lecturer

Hernan Guerra

300

Panel after panel after panel. 

Assignment #07 - Academy Mansfield 

300

Wood

06

400

 What type of Bond is used to guarantee that a general contractor will perform all work in accordance with the contract documents and deliver the project upon the specified substantial completion date?

Performance Bond

400

The security document executed by the Bidder and the Surety, furnished to the owner to guarantee that the Bidder will enter into a contract with the owner if the contract is awarded?

Bid Bond

400

What is the name of the department head of the Department of Construction Science?

Dr. Phil Lewis

400

GRADE BEAMS

Assignment #04 - Eugene McCray Community Center

400

Steel, Steel Erection, Metal

05

500

 Which elements can be used to support the pipe braces that temporarily hold up the concrete tilt wall panels during construction?

Helical Piers

“Deadman”

500

This estimate includes all costs, such equipment, labor, material, overheads, and services. It also includes the contractor's fee (profit) for completing the items of work comprising all the elements of the project.

Lump Sum Bid

500

Interim Dean

Patrick Suermann

500

This assignment tested your ability and knowledge in estimating 

Assignment #01

500

Plumbing 

22