A
B
C
D
E
100

What does Project Setup ALWAYS overlap with? 

Day 1 Walk 

100

How can you tell if you are working on an Estimate Tab Redfin Now job? 

The Estimate Tab is present 

100

True or False: The paint colors selected by the PM should be copied into the paint work lines by the estimator 

True

100

Does Overtime need approval before taking it or after?

Before 

100

Which of these markets is a paint-separated market?

a. Seattle

b. San Francisco

c. Boston 

d. Inland Empire 

Boston 

200

Where should a window pane replacement go in the schedule? 

Before exterior paint 

200

If a PM requests a bath hardware, would we look under the Package or the Palette to find that product? 

The Package 

200

When scoping, should the estimator add in each work item individually or use the work group associated with the package that was chosen? 

Use the work groups as often as possible, this will help you choose the right product! 

200

What should we do if the PM does not provide Interior paint colors on a scope? 

Push it back with RN01 and ask for the colors 

200

What should we do to all of our RedfinNow scopes and Concierge scopes once all work items are added to the Improvements?

Sort work items to like with like 

300

Who on the team has the loudest dog? 

Julia... sorry for all of your eardrums

300

What is Christin signature phrase? 

Two possible answers: 

"That's whats up" 

There are too many to list :)

300

When the Spectora line is missing from the estimate tab, should the estimator add the service line? 

Yes

300

Is Project Start a critical path schedule line?

No, it should overlap with your first Critical path line.

300

When using this line: Plumbing: Supply/Install Kitchen Sink (with new countertops) what do we always need to include? 

Plumbing: Install Kitchen Sink Drain Lines/P-trap

400

Is Punch List a critical Path schedule item? 

No 

400

What determines the flooring color, the Palette or the Package?

The Palette

400

When working on a scope in the new Estimate Tab, what is the last step of the Spectora Service item?

Add the total cost of the repair lines to the Spectora service line.

400

What should be added to the notes in Builder Tools at the end of every job? 

A schedule photo 

400

When triaging a RN ticket, what are the 4 uploads the estimator is responsible for?

The PDF of the Spectora

The Matterport Floorplan

The CSV of the project before you begin

The CSV of the project after you are finished 


500

What schedule item is in all Redfin Now jobs but not in any Concierge jobs? 

a. Project Start

b. Project Setup 

c. OTC Permitting 

b. Project Setup 

500

True or False: On an estimate tab job you will have 2 uncategorized work items in your schedule (the Design Package and the Quality Selection)

False! The estimate tab does not use the design package work item or the quality selection work item, so you should not have any uncategorized work items.  

500

What is Dennis' Favorite restaurant? 

Jimmy Johns

500

What are the 3 Ws? 

What are we doing 

Where are we doing it

With what materials

500

Is Shane having a baby boy or baby girl? 

Baby Girl!