Tomahawk
SUPPLY
WEPS/CS
OPERATIONS
EXEC/NAV
100

a missile rocket motor fails to ignite after an operator has initiated launch

-declared a DUD after 30 mins elapsed without missile launch

What is misfire.

100
What does MOV stand for and what are the types of MOV's?
What is Material Obligation Validation, External and Internal.
100
What does "SONAR" stand for?
What is Sound Navigation and Ranging.
100
What are the 2 anchors onboard USS John Paul Jones and how many shots are in each?
What is the Navy Standard Stockless (12 shots) and MK 2 Light Weight (8 shots).
100
WHAT THREE CLASSES OF VESSELS EXISTED AT THE INCEPTION OF THE NAVY AND HOW MANY GUNS DID THEY CARRY?
What is SLOOPS OF WAR 10-20 GUNS, FRIGATES 28-44 GUNS, SHIP OF THE LINE 64-100 GUNS.
200

-23 onboard

-secures ventilation intakes to prevent toxic fumes from entering the ship during missile launch

-actuate automatically with each launch and remain shut for 2 mins

What is Toxic Gas Vent Dampers (TGVD)

200
WHAT ARE THE SIX TYPES OF HAZMAT?
What is FLAMMABLES, AEROSOL, CORROSIVES, COMPRESSED GASSES, OXIDIZERS AND TOXICS.
200
WHAT IS THE RATE OF FIRE OF THE 5”-54?
What is 15-20 PER MIN.
200
WHAT IS THE PRIMARY MISSION OF CIC?
What is GATHER, PROCESS, DISPLAY, EVALUATE AND DISSEMINATION OF TACTICAL INFORMATION.
200
NAME THE SIX AREAS THAT MAKE UP NAVAL DOCTRINE?
What is NAVAL WARFARE, NAVAL INTELLIGENCE, NAVAL OPERATIONS NAVAL LOGISTICS, NAVAL PLANING NAVAL COMMAND AND CONTROL.
300

-designated location from which the ship plans to launch from

-may be changed as needed

Preferred Launch Position (PLP)

300
WHAT DOES COSAL STAND FOR? WHAT IS IT?
What is COORDINATED SHIPBOARD ALLOWANCE LIST. LIST OF ALL REPAIR PARTS AUTHORIZED TO BE CARRIED ON BOARD.
300

What is the definition of TOP SECRET

Grave danger to National Security, highest classification

300
WHAT IS THE COLOR SEQUENCE FOR THE NUMBERED FLAGS ON THE P/D LINE?
What is GREEN, RED, YELLOW, BLUE, WHITE
300
WHEN DID THE VOYAGE OF THE GREAT WHITE FLEET BEGIN?
What is 16 DEC 1907.
400

-EMs plan from ship to First PrePlanned WayPoint (FPPWP)

-FPPWP is where the preplanned mission Over the Land (OTL) route begins

-max of 5 waypoints with a max turn of 90 degrees

What is Over the Water (OTW) Routes

400
WHAT IS DLR? AND WHAT ARE THE TWO TYPES OF DLR’S?
What is DEPOT LEVEL REPAIRABLE. TURN-IN AND REMAIN IN PLACE
400
WHAT ARE THE FREQUENCY RANGES FOR THE FOLLOWING: HF, VHF, UHF, SHF, EHF?
What is HIGH FREQUENCY 3 MHz TO 30 MHz VERY HIGH FREQUENCY 30MHz TO 300 MHz ULTRA HIGH FREQUENCY 300 MHz TO 3 GHz SHF 3 GHz TO 30 GHz EHF 30 GHz TO 300 GHz
400
WHAT FOUR TYPES OF COUNTERMEASURES CAN THE SLQ-32 CONSOLE LAUNCH?
What is MK214 SEDUCTION, MK216 DISTRACTION, MK245 INFARED, AND NULKA
400
WHAT ARE THE FIVE STEPS OF ORM?
What is ID HAZARDS, ASSESS THE HAZARD, MAKE RISK DECISIONS, IMPLEMENT CONTROL, AND SUPERVISE
500

compares ground reference information loaded into missile prior to launch with pictures taken with onboard camera to provide accurate and precise fixes

What is DSMAC (Digital Scene Matching Area Correlation)

500
WHAT IS THE PURPOSE OF BAMS?
What is A COMPLETE INVENTORY OF ALL PARTS, STOCK & CONSUMABLES FOR THE ENTIRE BATTLE GROUP.
500
WHAT IS THE RANGE OF THE SPY-1D RADAR?
What is 256NM SEARCH AND 512NM TRACK.
500
WHAT DOES ASTAC STAND FOR AND WHAT DOES ASTAC CONTROL?
What is ANTI SURFACE/ANTI-SUBSURFACE TACTICAL AIR CONTROLLER, HAWKLINK AND IS RESPONSIBLE FOR THE CONTROL OF ALL ASSIGNED SUW & USW AIRCRAFT.
500

WHAT DOES # INDICATE IN SKED?

MANDATORY RELATED MAINTENANCE