Pre-Construction
Construction & Closeout
Safety
Transportation
100

Name an activity that takes place before construction starts?

Planning, Estimating, permitting ...etc

100

What are the 4 main ingredients in concrete?

Water, Portland Cement, aggregates, and air

100

What are three types of personal protection equipment worn on construction sites?

Hard had, safety vest, eye protection, safety toe shoes, hearing protection, respirators

100

Mention three forms of transportation

Busses, Trains, Planes, and Ships

200

Name the parties involved in a construction project?

Contractor, Owner, Engineer

200

What is the name of the oldest type of machine which removes earth?

Excavator

200

What are types of fall protection?

guardrail systems, netting systems, personal fall arrest systems (body belts, harnesses)

200

Mention the types of pavement materials we use in our roads?

Asphalt and Concrete

300

What was the total construction cost of the Empire State Building?

$41 Million 

300

What is the name of the tallest building on earth?

Burj Khalifa

300

At what height are construction workers required to use fall protection?

6 or more

300

What does "FHWA" stands for?

Federal Highway Administration 

400

How much construction steel was used to build the Eiffel Tower?

7000 metric tons

400

What is the term QC stand for?

Quality Control

400

What depth should a stairway or ladder be installed in trench excavations?

4 feet or more

400

What does "HOT" stands for

High Occupancy Toll

500

Why do projects always seem to take longer than expected?

Activities have not been thought of that take the extra time; Necessary tasks overlooked during planning

500

What is the name of the set of drawings submitted by a contractor upon completion of a construction project?

As-Built Drawing

500

How deep can a trench be without reinforcing the sides with shoring?

5 feet

500

What are the different layers that it takes to build a road?

Surface, Base, Sub-base, Sub grade