Facts
History
Tunnel and terminals
Opening
Technical
100

How long is Channel Tunnel?

50.46-kilometre (31.35-mile)

100

Whose idea was it to create this tunnel?

Albert Mathieu-Favier

100

What does the UK uses for access?

M20 motorway

100

Where did the first opening take place?

Calais

100

How long is the tunnel?

 50,45 km

200

How fast the train goes in the tunnel

160 kilometres per hour (99 miles per hour)

200

What year the Channel Tunnel was opened

1994

200

How much is the main-line track at Folkestone?

20 km

200

Where was the second opening?

Folkestone

200

What is the tunnel lowest point?

75m

300

Who ownes and operates the tunnel?

Getlink

300

Who was the queen who travel through that tunnel in 1994?

Elizabeth II

300

How many platforms are in the Folkestone?

8

300
What president was at opening?

 François Mitterrand.

300

How many tracks are there?

2 single track tunnels
1 service tunnel

400

What was the purpose of the tunnel first?

To be able to ride in a horse-drawn carriage

400

In what year did the tunnel construction began?

1988

400

What are the 3 tunnels

2 railways, 1 service tunnel

400

What was the name of the train the president and queen rode on?

Le Shuttle

400

What is the track gauge?

1,435 mm, standard gauge

500

How much did it cost to build the tunnel?

£4.65 billion

500

How many people died during the construction?

10
500

From what motorway networks are the terminals easily reachable?

M20, A16

500

Where did the queen come from and where did the president come from?

From London and France

500

What trains run there?

Passenger trains, freight trains, vehicle shuttle trains