HISTORY
Technical
Fackts
Building
Traveling
100

What year the Channel tunnel was opened?

1994

100
What is the Tunnel lenght?

50km/31miles

100

How many tickets they sell in 2023?

around 11milion

100

How long did the construction take?

6 years

100

How much people traveled at the peak time 1998?

18.4 milions

200

What kind of trains were first in tunnel 1994

freight trains

200

What is the power source for trains?

overhead line (electrified)

200

What means the "nose to nose" meeting?

François Mitterrand and Queen Elizabeth II meeting

200

How large are the "larger" tunnel (wide)?

7.6m wide

200

Why there is a need for full passport control?

border between the Schengen Area and the Common Travel Area

300

Who proposed tunnel idea in 1802

Albert Mathieu-Favier

300

What kind of track gauge they use?

Standart gauge, Europe, Usa, East Africa, Asia

300
What is the dip in frence side

5*

300

What year digging started?

1988

300

In what city trains stopped in france for passport control

Stop in Lille 

400

What was the purpose of the first tunnel plan?

transport with horses 

400
What is operating speed for trains?

160kmh

400

How many were employed at the peak time?

15000 people

400

What tunnel they digged first?

service tunnel

400

In what year direct service from London to Amsterdam started

2018

500

What happened 2015 June/July in tunnel?

 problem of migrants

500

How many tracks are in tunnel?

2 single tracks

500

What car John Surtess drove from England to france in 2009 (using service tunnel)

Ginetta G50 EV electric sport car

500

In what year they meeted under sea?

1990

500

What motorway The UK site uses?

M20 motorway