25Live
Production Schedule
Venues
Teams
Social Tables
100

The search is used to find an event using the resource number.

What is Event Search.

100

The PS starts off as what type of document

What is Excel

100

The cost for a department to reserve UU220?

What is $220

100

The production schedule folders

What are A. Sent to Customer B. Received From Customer C. Ready for staffing D. Staffing Scheduled
F Final G Past Events and Reoccurring Events

100

Social Tables is

What is digramming web based software

200

Name the report used for the event meeting.

What is Location Activity Date Grid.

200

The fields filled in when sending to Client.

What is
Sponsoring Organization
Event Title
Event Date
Event Location
25 Live reference #
Pre -event
Start time
End Time
Reservation Link
Primary Contact Information
Package rate
Total estimated costs

200

Venues that have built in special lighting - be specific

What is
065-205
MAC

200

Channel for making time changes

What is Event Changes

200

The method for adding items to a diagram

Click on object
Drag to Diagram
Release mouse

300

The tab used to view the pre and post event time.

What is Occurrences?

300

Process to add the diagram link to the form

What is
Copy the link from social tables
Click on Insert
Click on link

300

The tables offered in the MAC, Chumash, Plaza and UU220

Mac - 5' round and 8'X30" rectangle
Chumash - 5' round and 6'X30" rectangle
Plaza -  5' round and 6'X30" rectangle
UU220 - 6' X 24"

300

Where invoices and estimates are stored

What us Event Logistics! Invoices
Event Logistics! Estimates

300

When creating a diagram what should be your first action?

What is looking for an existing diagram from a past event.

400

Things to check before requesting a time change.

What are:
Time line for changes
Venue availability


400

Describe the steps in finalizing a Production Schedule.

Down load Excel
Review PS for errors
Correct as needed
Save as Adobe PDF
Combine the pages
Add the estimate
Review for bank pages and formatting
Upload to final
Print and deliver
Move Excel to Event Logistics!
Update assignment spreadsheet

400

Fire Marshal and ADA Spacing 

Stage to front row 7'
Exits cleared 10'
Seating rows more than 2.5 feet
Table spacing 3.17 feet
Aisle width 36" - if longer than 200' need 60" wide.

Any temporary seats in rows of more than seven (7) seats need to be clipped together to stop topple.

The maximum number of seats in a row without an escape gangway at either end is 12 seats

The maximum number of seat in a row with escape gangways at either end is 25 seats


400

The time our work is reviewed by the entire Event Management Team

What are the weekly event meetings.

400

Frequently used room layouts should be?

What is saved for future reference

500

The tab used to view the Organization and Event Type.

What is details.

500

Describe in detail the steps taken after receiving the Production Schedule back from the customer?

What is
Check the time of the reservation to 25live.
when does the client plan to arrive
Look for missing information
Are all deliveries occurring during the pre-event time. Will all items be removed during the post event time.
Food? Catering?
A/v needs
Room set-up
Itinerary

500

ASI Managed Facilities

What are
Children's Center
Rec Center
University Union
Sports Complex

500

Channel to notify of extra chares, late fees, etc

What is billing changes

500

The important thing to check after finalizing a production Schedule

What is make sure the link to the diagram works.