Draws
ITC Agreements
Color Selections
Site Meeting Checklist
Settlements
Culture
Codebook
HR / Marketing
200

On a cash finance deal, after the initial $1000 deposit has been received, how many draws will happen during the build?

5:(20%)(15%,35%,35%,15%)

200

What are the insurance requirements for an ITC setup?

$1,000,000 General Liability.  $500,000 Worker's Compensation

200

What is the color of our standard Whirlpool Appliances?

Stainless/Black

200

Name 6 important items that a PM needs to have with them at a Site and Builders Meeting?

EDO, Survey, Set backs, Covenants, Grade stakes, Transit, Paint, 2 Tape Measures, Camera, Compass, Probe Rod

200

What two items need to be done before a customer can receive their house keys after settlement?

Certificate of Occupancy and Final Payment

200

DAILY DOUBLE!!!!

What is Keith Brown's Job Title?

200

What is the minimum head height clearance for stairs?

6'8" or 80"

200

Who at the local level is able to give out employee references?

Nobody, only the HR department can do so

400

At what draw can the referral check be issued?

Foundation Draw

400

What is the fee if a jobsite isn't cleaned at the end of the day?

$100

400

What brand is our door hardware?

Copper Creek

400

What are 3 Items on the Site meeting checklist that need a Length?

Driveway, Driveway Pipe, Water Line, Sewer Line, Gas Line

400

Who needs to be named additional insured at time of settlement?

AHP

400

What year was AHP founded?

1972

400

Where is splicing of top and bottom plates allowed?

Above or below vertical studs

400

What month or months of the year are the open enrollment period for AHP insurance and benefits?

March and/or April

600

Name 3 stages of construction where draws are requested on a cash job?

Foundation Complete, Framing Complete, Drywall Hung, At Settlement and after C/O

600

What document must an ITC acknowledge with a Change Order?

Scope of Work or Vendor Alert

600

What brand do we use for our plumbing fixtures?

Delta

600

What Measurement is important from the PM to ensure that the material ordered is the correct length?

Height of porches

600

How long is the Sentricon termite bait system good for?

1 Year

600

What 2 goals are called the Bookends?

Raving Fans and TEAM

600

Where are double jack studs required?

Any opening over 6'

600

What day of the month is the approved Ad Budget for the following month due?

The 20th of each month

800

Who at corporate is responsible for bank wires?

Claudette Bragg or Anna Mulligan

800

How much time does an ITC have to request pay for work performed after completion?

90 Days

800

How many standard WALL colors can a customer have during a color selection?

2

800

DAILY DOUBLE!!!

Name 3 of the 4 responsibilities of the homeowner regarding power?

800

What items must be completed from the COW walk prior to Settlement?

All of them

800

What 5 offices are included in the Statesville Division?

Statesville, Wilmington, Greensboro, Monroe, and Fayetteville

800

Name 3 locations that a window must be tempered?

Slip area, within 2' of a door, any window pane over 9 sqft and less than 18" off the floor, in a staircase

800

What is the apparel budget per employee after the first year?

$100 + Tax after the 1st year of employment

1000

What document does every lending institution require of AHP to finance the mortgage?

Builder's Risk Policy

1000

Name 3 of the 4 email recipients at corporate who get emailed a quote sheet once completed and approved?

Quotes@AHP, Shawn Murchinson, Nick Delozier, Michelle Ryan.  

1000

On our faucets, what is the line for the kitchen and what is the line in the bathrooms?

Corranto for the Kitchen and Woodhurst in the baths

1000

Besides the SM Checklist, what other document does the PM have to fill out for the file?

Job Map

1000

What report should be printed and attached to the preliminary settlement statement for GM approval to ensure that all job phases have been paid to date?

Job Cost Detail Report

1000

What is the AHP mission statement?

We build people who build houses, so that families can build homes

1000

What is the minimum SF to be considered a habitable room?

70 SF

1000

After being employed for 9 years with AHP, how many full paid days off do you get per year to include holidays, vacation and birthdays?

24 (15 vacation, 1 BDay, 1 Anniversary, 7 Holidays:New Years, MLK, Memorial Day, 4th of July, Labor Day, Thanksgiving, and Christmas)