Greet & Verify
Qualify to Terminal
Survey Cux Prem
Extend to Home
Connect Gateway
Finalize Experience
Verify and Thank
100

What is the first step in the Greet and Verify?

Pre-call the customer

100

The 2 locations visited by a technician during the Qualify to Terminal step

PFP and CFST

Or

Empo and IDF 

100

Things to look for when surveying premises

roadblocks, hazards

100

The first step in Extend to Home

Attach drop to prem

100

the first step after completing NID installation

Run IW to jack location

100

The 4 actions we guide customers through in SHM app

Active Armor, Enable notifications, SSID, Speed Test

100

The last thing we do before leaving premises

Answer questions and address any concerns

200

What is the second step to do in the Greet and Verify?

Drive safely to premises maintaining a space cushion and obeying all traffic laws

200

The required actions at the PFP

True test, scopes, verify light on jumper, connect jumper, verify LSBBT

200

What we assess during survey premises

NID placement and drop path

200

The tests required at CFST

True test and scope

200

What we do after installing jack and performing necessary tests

Activate ONT, validate customer registration, submit picture of jack

300

The four topics to discuss with the customer during the Pre-call?

Introduce yourself, Verify appointment, verify service to be performed, share ETA

300
List the 3 scopes required at the PFP

Launch cable, Bulk head, Jumper

300

why we survey customer

to determine optimal RG placement

300

The information required in a slack NID

UUID

Distance to PFP

Light level

Date

300

The 5 scopes required inside the prem

Launch cable, jack, both ends of shuttered jumper, SFP

400

What does the "Meet and Greet" include?

Hold initial conversation, set expectations, explain install process, remind customer to download SHM app

400

Required actions at the CFST 

verify light, clean port, attach drop, coil drop safely at the bottom of the pole

400
The test we perform during this step in Expert Path

Wifi Assessment

400

The requirements for buried drop runs

Tag at CFST and scotch lock at CSFT, conduit cover or silicone, flex pipe, 2 wall attachments, seal gromets, scotch lock in NID, information in NID