100

An internal review board that has the same name as the engineering document it reviews

What is SIG?

100

A list of the sections in a document, usually with page numbers, found at the beginning of the document

What is Table of Contents?

100

This group decides how information is presented to controllers

What is the CHI Team?

100

The first stop for most site tickets

What is Triage?

100

Don't let this requirements tool slam on you!

What is DOORS?

200

Joint FAA/Leidos Engineering meeting to review SIG and PRED requests

What is CRB?

(Change Review Board)

200

An aviation term which describes the point at which a flight reaches cruise altitude

What is Top of Climb?

200

All twenty enroute sites are represented on this team

What is the NUT?

(National User Team)

200

The ticket type needed to change baselined documents

What is an ER?

(Engineering Request)

200

A graphical UML and SysML modeling tool that describes data and system threads 

What is the Windchill Modeler?

300

This FAA board doesn't have anything to do with the Gaithersburg office building

What is the Risk, Issue and Opportunity (RIO) board?

300

A social media platform for creating and sharing short videos, and an alternate spelling of this category

What is Tik Tok?

300

Before any release is fielded, controllers try to break it doing this

What is Ops Eval?

(Operational Evaluation)

300

This ticket disposition is frequently misunderstood as indicating we intended to create a problem  

What is WAD?

(Working as Designed)

300

The FAA created this tool for recording review comments

What is PRAT?

(Peer Review Automation Tool)

400

The board where RMA measurements are calculated and reported quarterly

What is the Failure Review Board (FRB)?

400

The action of sending a frequency message via CPDLC

What is Transfer of Communication?

400

Variations include SLE, AT, Tech Ops, and TI

What is SIB (Stakeholder Interest Board)?

400

Similar to a PR, this is the most common AIMS ticket type.

What is a Trouble Report (TR)?

400

Contradicting its name, this tool designates many PRs as "do not work"

What is the MFL?

(Must Fix List)

500

Variations are Engineering, Program and Hardware

What is Change Control Board (CCB)?

500

They may not be as speedy as their name suggests, but they keep adaptation releases on time

What is FAST?

(Field Automation Support Team)

500

The first stop on your way to engineering tools such as IDT, CM Tool, BigE and many more

What is the PMF (Production and Maintenance Facility)?