1. Instructions and Codes
2. Projects and Contractors
3. From Div. 1 Specs
4. Miscellaneous
5. Engineering Staff
100
Title of NAVHOSPBREMINST 5103.1G
What is a. Minimum Protective Measures for Facilities Work ?
100
What Contractor is responsible for the Outpatient Pharmacy Expansion and Inpatient Pharmacy Renovations?
What is RORE, Inc?
100
All requests to interrupt life safety systems such as fire alarms and sprinklers, for more than ___ hours in a 24 hour period, will require Interim Life Safety Mitigation (ILSM) procedures to be implemented.
What is 4?
100
What are the two contract execution agents we use to award projects?
What is NAVFAC and USACE?
100
What does our most recently hired PM have in common with his predecessor?
What is Both ride Harley’s?
200
The Contractor shall have on its staff a _______________________ . This employee shall be a member of the QC program, and work under the authority of the QC Manager for implementation of the Healthcare Construction Control Plan, and must always be present when work is in progress.
What is Certified Healthcare Constructor (CHC)?
200
Which NHB Project Manager was in charge of an energy project to install a lighting control system throughout the hospital?
What is a Gary Crist?
200
Contractors shall limit vibration causing activities and all high noise activities to the hours between ____ and _____.
What is 1600 and 2000?
200
What does REAP in relation to Post-Earthquake Evaluation mean?
What is Rapid Evaluation & Assessment Program ?
200
2 members of Engineering drive the same make of car; who are they and what is the make?
What is Kristin & Gary, Subaru
300
Project L-55028-16 Life Safety Assessment will perform an assessment of the hospital and clinics for compliance to the _______________ code.
What is NFPA 101 Life Safety Code, 2012 Edition ?
300
Who is the prime contractor responsible for project, RM 551-13 Repair Surgical and Support Areas?
What is GSI Pacific, Inc?
300
Interruption or change in state to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, fire sprinkler, medical gases, compressed air, and purified water systems are considered utility cutovers. Requests for utility interruptions or change in state must be submitted ____ working days in advance of the proposed outage/change.
What is 21?
300
What is the listed square footage of B01 in the property record card? (to the nearest 10,000)
What is 255,752 SF ?
300
Why is Gary not here today?
What is He’s attending racing/driving school ?
400
Names of 2 of the 4 FORMS that are required under NAVHOSPBREMINST 5101.1G?
What is a. (5103/1) Pre-Construction Risk assessment b. (5103/2) Interim Life Safety Risk Assessment c. (5103/3) Infection Control Risk Assessment d. (5103/4) Protective Measure Inspection Checklist
400
Which NHB Project Manager was in charge of the recent replacement of the flooring in the UCC?
What is a Paula McAvoy?
400
All Contractor personnel shall attend (2 WORDS) training to obtain an Above Ceiling Permit and/or when any penetration is made through a fire-rated building component. Training is provided by the Facility Management Department to show NHB expectations for sealing penetrations.
What is Fire Stopping?
400
What does SMS stand for and where is it located?
What is Seismic Monitoring System Located in Rm. 1512?
400
Prior to LTJG Piester, who were the previous three Engineering Division managers?
What is: a. LT Giordano b. LTJG Cotherman c. LT Pollesch
500
5. What UFC (Unified Facilities Criteria) design standard does the hospital fall under?
What is UFC 4-510-0 Design: Military Medical Facilities?
500
What is Ron Lyerla’s position title?
What is Quality Assurance (QA) for the Chiller Project?
500
The Base Operations Service Contractor (BOSC) shall be used at the (2 WORDS)_ to secure and energize utilities, and re-energize the utility when work is complete, as required by the Contractor via the outage process.
What is Contractor’s Expense ?
500
Name two of the three approved Special Projects programmed for FY19.
What is a. Restore Ventilation Ductwork – Building 1 b. Restore Clinic – Building 940 c. Restore Patient Tower (Floors 4, 5, 6, 7) – Building 1
500
In the last year, one of our project managers has traveled to 6 countries. Which project manager was it and name three of the six countries visited.
What is a Paula McAvoy? i. Mexico ii. Italy iii. Greece iv. Turkey v. Israel vi. Malta