Steps to lock out equipment
Notify, Turn Off, Isolate, Lock, & Verify
Safe walking practices prevents injuries from _____, ________, & ______
Slips, trips, and falls
person who can release a control stop
Only the person who stopped it
"------ --------- always guarded"
once guarded
What does JHA stand for?
Job Hazard Analisis
Steps to restore equipemnt
Inspect, Notify, Unlock, & Restore
Research has shown that walking at a brisk pace at least ____ minutes a week can improve your blood pressure, blood sugar and blood cholesterol levels.
150
Jam breaking, retrieving packages at the end of a sort, or repositioning portable diverters
why operations will control stop a conveyor
________ supervisors must perform a daily pretrip inspection of their area that includes an inspection of the conveyor guards. They must report any missing, damaged or open guards to BaSE or their manager before the start of their operation.
Operations
The potential for harm on the job
Job Hazards
Responsibilities of the person stationed at the disconnect
Remain in direct view or radio contact with the authorized person in charge.
If you work outside, make sure your ________ is sturdy enough to handle all potential environments and terrains you will encounter.
Footwear
Used by mechanics to retrieve packages inside of a guard
Lock out Tag out
Restricted Areas must have at least ____ clear (vertical height) designated walk paths.
5' 6"
Mechanic needs to DEFOD a journal. Which step of the JHA does he think about before reaching for the FOD
Is Lockout required to complete this job?
Whenever it is necessary to remove a guard to track a conveyor the mechanic should do these things
- Station a member at the disconnect
- only remove guards necessary
- Observe belt tracking away from live parts
- Stop conveyor before replacing conveyor guards
Walking can lower your chance of developing this
heart disease
All control stations must have these 3 items
- Control station name
- Affected area label
- Securing tag and latch for the pushbutton
Guard all 4 of these
- Chains and sprockets
- Pulleys & Rollers
Mechanic needs to bring 200ft of belting to PD4-3. Which part of the JHA should he consider?
Do I need help to complete any part of this job?
What are the steps of what to do upon completion of a live repair?
- lockout the conveyor and inspect for FOD, missing guards, etc
- Replace or close any missing guards
- account for all assistants
- Restart conveyor according to lockout procedures
Walking is ____________
WORKING!
First step to un-securing a conveyor
Make sure everyone is off of the conveyor
Any pinch point on a conveyor component that is within 8" of the proposed guard location must be guarded with a maximum of
½" wire mesh.
This should be done before every job and before coming to work
Have I stretched before starting the job?