The 5 mandatory sections of a formal work package
What are
1. Initial Conditions
2. Materials
3. Procedure
4. Test and Inspection
5. System Restoration
Purpose of a Maintenance Requirement Card?
What is to Provide detailed procedures for performing maintenance requirements?
The US Navy's first aircraft carrier, USS Langley, was built by converting an already existing ship. This ship, a collier as originally built, was commissioned into the US Navy in 1913 with the name of which Roman deity.
What is the USS JUPITER?
Fundamental Rule of all Maintenance
What is that technical specifications must be meet at all times?
Designed to provide a ready reference of planned maintenance requirements which will be retained in the working area for use by the Work Center Supervisor and maintenance personnel.
What is the Work Center PMS Manual?
Which US President depicted on Mt. Rushmore does NOT have a US aircraft carrier named after him?
Answer: Thomas Jefferson
CVN-71: Theodore Roosevelt; CVN-72: Abraham Lincoln; CVN-73: George Washington
3 SUBSAFE boundary Groups
What are
1. Hull Structure
2.Sea-connected/Seawater Systems
3. Non-Seawater Piping Systems and Mechanical SUBSAFE systems
Responsibility to review schedules ensuring maintenance is level loaded and not scheduled to avoid assessment?
Who is the Division Officer?
This aircraft carrier launched the "Doolittle Raid" aircraft?
USS HORNET
If the final torque needs to be 150 foot pounds what torque wrench spec should you choose?
between 20 and 90 percent of final torque
Ship’s 3M System Manager?
Who is the XO?
In 1960 this US NAVY submarine became the first boat to travel completely around the world underwater.
What is the USS TRITON (SSN-586)
Duties and Responsibilities for a Craftsman
Status I IEM.
What is Equipment not scheduled for overhaul for 7 days or greater?
Submarine warfare played an important role during WWII. How many U.S. submarines were lost during WWII?
What is 52?