INTRO TO FIRE
SEARCH
VENT
FORCE
BUILDING
100

Formal line of authority, responsibility, and communication within an organization

Chain of Command

100

VEIS method of search stand for

VENT, ENTER, ISOLATE, SEARCH

100

Heat transfers these three ways

Conduction, Convection, Radiation

100

Combination of tools known as "irons" include what two tools?

Flat head axe and Halligan tool

100

This type of window has two or more sashes of which at least one move horizontally within the window frame

Sliding

200

Concept that each employee reports directly to just one supervisor 

Unity of Command
200

A rapid search intended to rapidly determine location of victims

Primary Search

200

Critical coordinated communication between these two task-oriented teams needs to be established before vertical ventilation takes place

Attack Team and Ventilation Team

200

The longer the time period between forcing entry and making entry for interior fire attack allows the fire to ______ and changes the _______

Entrain new oxygen

Flow Path

200

Traditional style single family dwelling is this type of construction

Type V

300

Optimum number of subordinates that any one supervisor can control

Five
300

A slow, thorough search conducted after the fire is under control

Secondary Search

300

Door control is another form of _____ which can alter the______

Natural ventilation 

Flow Path

300
The golden rule to forcible entry

TRY BEFORE YOU PRY

300

Construction type is determined by the construction materials used and by this criteria

Resistance to fire exposure

400

Guide to decision making within an organization

Policy

400
An atmosphere is considered oxygen deficient and an IDLH atmosphere if the oxygen level is  

Below 19.5 % 

400

Failure of windows, doors, and structural members as a result of heat/ fire exposure are examples of

Unplanned ventilation

400

Process of creating a hole in a wall or floor to gain access to a structure or portion of a structure

Breaching

400

This type of building construction is reinforced concrete, precast concrete, and protected steel frame construction

Type I

500

Detailed written plan that lists specific steps for approaching a recurring problem

Procedure

500

LEL meters will typically sound an alarm at this ____ level of the LEL detected

10 percent

500

A compartment that does not self-ventilate before consuming all of the available oxygen becomes 

Ventilation-limited decay

500

When forcing an inward swinging door, the bevel of the forks on Halligan bar is against the

DOOR

500

Type IV construction is characterized by the use of large dimensional lumber or laminated wood is also known as

Heavy Timber construction