Problem Solving
Flow/Pull
5S
Value Stream Management
100

What does the acronym TAGS abbreviate?

Trend, actual, gap, standard

100

What term is used to describe moving one unit at a time through the process without batching, so work progresses smoothly step to step

Flow

100

What is the name for the process that creates a clean, organized, and visual workplace where problems are easy to see and fix

5S

100

What are all the process steps, including both value and non-value add, required to transform a product/service into something a customer will pay for?

A Value Stream

200

What are the 4 main steps in problem solving

Define, analysis, countermeasure, sustain

200

What is a system where production is based on actual customer demand (consumption) rather than forecasted demand.

Pull

200

What 5S step means to separate - based on what the operation needs versus what is not needed

Sort (Seri)

200

What is the first step of a value stream analysis

Complete a PQPR

300

What type of problem is it when a previous standard or goal is no longer being met

Caused Problem

300

What is the formula for "Takt time"

Available Time / Demand

300

What 5S step means to sequence - place what is utiilized in the sequence of use

Set (Seiton)

300

What does acronym PQPR abbreviate?

Product Quantity Process Routing

400

In the "Pareto Principle", what % of results come from ~20% of the effort

80% (approx ok)

400

What is the name of a visual system that drives supply execution based on what is pulled by the consumer

Kanban

400

What are the names of the 5S processes in English - There are 5 and they start with S

Sort, Set, Shine, Standardize, Sustain.

400

Name 4 of the 8 types of waste

Defects. Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra Processing.

500

What is the order of problem solving hierarchy at GE

Daily Mgmt, APPS, Structured PSR, Kaizen, HK

500

Name two types of waste that flow helps reduce

waiting and inventory

500

What is the standard color for shop stairs and mezzanine railings

Yellow (Specifically Rust-Oleum Enamel Safety Yellow, Gloss…this detail not required but interesting fact)

500

What deliverable defines and enables transformation from the current state VSM to the future state VSM

Kaizen Road Map