The Capacity Model
STKY Event Classification
Energy Wheel
Potpourri
Company Policy
100

This innovative approach to safety focuses not only on implementing controls that prevent incidents, but also the controls that mitigate incidents.

What is The Capacity Model?

100

There was an unexpected or uncontrolled release of energy that could have reasonably resulted in a STKYa.

What is a STKY Event?

100

Stuff that's hot or cold.

What is temperature (energy)?

100

Planning your work in advance to make sure you have everything you need.

What is a look ahead?

Do you have all the safety, material, tools, information? typically 3/6 weeks look ahead

100

You must have a ____ in place for high hazard work, or any live work & gear/equipment energization 

What is a MOP

200

A tool to equip workers to recognize sources of energy to determine the controls needed.

What is the Energy/STKY wheel?

200

There was an unexpected or uncontrolled release of energy that resulted in a life-altering, life-threatening, or life-ending event.

What is a STKY actual (SKTYa)?

200

Stuff that twists, turns, or pounds.

What is Mechanical (energy)?

200

All employees must have a _____ & ____ done prior to using lifts, forklift, or other types of equipment

What is an inspection and a practical?

200

You must report these as soon as they are discovered / occur.

What is an incident?

300

Recognizing a situation could be STKY, but corrective action or intervention stopped the event

What is Good Catch?

300

There was an unexpected or uncontrolled release of energy, but there were adequate controls in place, so no one sustain life-altering, life-threatening, or life-ending injuries.

What is STKY success (SKTYs)?

300

Stuff that's living.

What is biological (energy)?

300

The things that trigger an unwanted event

What is Cause?

300

This concept gives every employee not only the right, but also the responsibility, to speak up if they believe an activity or condition is unsafe.

What is stop work responsibility?

400

The two types of controls described by the Capacity Model?

What is Preventative and Mitigative?

400

There was an unexpected or uncontrolled release of energy, where there were not adequate controls in place, but luckily no one sustained life-altering, life-threatening, or life-ending injuries.

What is STKY potential (STKYp)?

400

Stuff that's stressed.

What is pressure?

400

Acts, Objects, or Systems designed to prevent an unwanted event

What is Preventive Controls?

400

Company policy requires this for each field employee prior to work starting.

What is a PSP?

500

An unexpected or uncontrolled release of energy that results in a STKYa, STKYp, or STKYs.

What is a STKY event?

500

The first question you should ask when building Capacity for a STKY event

What is -- Is this enough or do you need more?

500

This tool helps increase the number of hazards identified on a jobsite from 45% to 75%.

What is the Energy Wheel /  STKY Energy based approach? 

500

Because it's not IF a failure occurs, it's _____.

What is WHEN?

500

This is required each week to be completed by every employee

What is a safety meeting?