How long can you do an equipment package for?
A. 24 Hrs
B. 30 Days
C. 6 Months
D. All the above
D. All the above
What does Batch A means?
Brand new out of the package
Yes or No: Can you edit your SLOC name in Stock/Pool
No (only in ZPBOSTRUC MRP Area)
Show how to create a lateral transfer?
ZPBOWKBH, Lateral transfer, Issue, Create PR, Plant, SLOC, and EXECUTE
Explain how to pull your component listing.
ZUSMENU, Property Management, MAT_SIT, UIC, 0-0_DOWN, deselect EXECUTE, right click, Print Component Hand Receipt.
Where can you go to view your equipment package?
ZPBOSTRUC
What does DLA stand for and what does it mean?
Date of Last Activity
The last time the equipment had action taken on it.
What movement type is used to bring equipment onto the books?
501
Show how to update your storage bin?
ZUSMENU, MAT_SIT, UIC, EXECUTE, Right click on the material situation page, Sto. Bn/Bench Stock/Local Repair.
Explain how to find your Commander and Provisional SLOCs.
ZUSMENU, Property Management, ZPBOSTRUC, UIC (the AA), Click the node to the left of the UIC, Select the PB UIC, Select the Navigation View icon (at top)
How do you know the status of the package change?
Loan status column
Yes or No: Can the Supply Rep can generate the inventory for the month.
No. (APO will generate them, but Supply Rep will pull them).
True or False: Serial number profile for GANO means the serial number is required.
False (Not required)
Walk me through the process of completing a final issue.
MB25 (Collect reservation#), MIGO 201/221, type reservation# (beside R09 reservation block), Execute
Explain process to create a reservation.
ZUSMENU, Reservation, MB21, Movement Type, Plant, New Items, SLOC, Good Recipient, Material, Qty, etc...
When the EPA number populate what status do you receive?
Active
What is one reason you would use ZPBOSTRUC?
To locate your SLOC or DoDAAC
What does MIGO mean?
Movements In, Goods Out
True or False: A Supply Rep can convert a PR to a PO.
True (only with authorization from the APO).
Explain how to create an Equipment Package.
1. ZUSMENU, PFEM, ZEPA
2. ENTER MTOE (UICPB), DATE RANGE, and EXECUTE.
Provide one of two reason codes for loaning out property?
Temp Loan
Sub HR
What is the difference between Accountability and Responsibility?
Accountability: Obligation imposed by law
Responsibility: Obligation of an individual
When a component shortage is discovered for an end item, what work order type is created to prompt the system to generate a reservation to fulfill the shortage.
PB01
True or False: You can use ZMB59 to view your complete transaction.
True (locate the Doc#, Movement type, and the Activity Log).
Explain how to print a component hand receipt.
MAT_SIT, UIC, Right Click, Print Component Hand Receipt, Select All, Component Type (COEI, BII, AAL), Print Options (with Illustrations and Long text)