How long is an equipment package good for?
A. 24 Hrs
B. 30 Days
C. 6 Months
D. All the above
All the above.
What does Batch A mean?
Brand new, out of the package.
Yes/No: Can you edit your SLOC name in Stock/Pool?
No. (You can edit in ZPBOSTRUC MRP Area).
Show how to create a lateral transfer?
ZPBOWKBH, Lateral transfer, Issue, Create PR, Plant, SLOC, and Execute.
Explain how to pull your component listing.
ZUSMENU, Property Management, MAT_SIT, UIC, 0-0_DOWN, select Execute, right click, Print Component Hand Receipt.
Where can you go to view your equipment package?
ZPBOSTRUC.
What does DLA stand for and what does it mean?
Date of Last Activity
The last time the equipment had action taken on it.
What movement type is used to bring equipment onto the books?
501
Show how to update your storage bin?
ZUSMENU, MAT_SIT, UIC, Execute, Right click on the material situation page, Sto. Bn/Bench Stock/Local Repair.
Explain how to find your CDR and Provisional SLOCs.
ZUSMENU, Property Management, ZPBOSTRUC, UIC (the AA), Click the node to the left of the UIC, Select the PB UIC, Select the Navigation View icon (at top)
How do you know that the status of the loan package has change?
By looking at the Loan status column.
Yes/No: Can the Supply Rep generate the monthly inventory.
No. (APO will generate them, but Supply Rep will pull them).
True/False: Serial number profile for GANO means the serial number is required.
False. (GANO means the serial number is not required).
Walk me through the process of completing a final issue.
MB25 (Collect reservation#), MIGO 201/221, type reservation# (beside R09 reservation block), Execute.
Explain process to create a reservation.
ZUSMENU, Reservation, MB21, Movement Type, Plant, New Items, SLOC, Good Recipient, Material, Qty, etc...
When the EPA number populate, what status do you receive?
Active.
What is one reason you would use ZPBOSTRUC?
To locate your SLOC and/or DoDAAC.
What does MIGO mean?
Movements In, Goods Out.
True/False: A Supply Rep can convert a PR to a PO.
True (only with a written memo from the APO).
Explain how to create an Equipment Package.
ZUSMENU, PFEM, ZEPA, Enter MTOE (UICPB), Date Range, and Execute.
What is one of two reason codes for loaning out property?
Temp Loan or Sub HR.
What is the difference between Accountability and Responsibility?
Accountability: Obligation imposed by law.
Responsibility: Obligation of an individual.
When a component shortage is discovered for an end item, what work order type is created to prompt the system to generate a reservation to fulfill the shortage.
PB01.
True/False: You can use ZMB59 to view your complete transaction.
True. (Locate the Document Number, Movement type, and the Activity Log).
Explain how to print a component hand receipt.
MAT_SIT, UIC, Right Click, Print Component Hand Receipt, Select All, Component Type (COEI, BII, AAL), Print Options (with Illustrations and Long text).