Block 1
Block 2
Block 3
Block 4
100

What is STACK's Uptime Commitment?

99.999% uptime minimum

100

What is Voltage?

Voltage is the difference in electric potential between two points

100
What percent of electricity is converted into heat in a circuit?
~99% 
100

What are the major classifications of procedures at STACK?

MOP, SOP, EOP, AP

200

What is a Data Center?

A Data Center is a facility that houses computer servers, enabling our modern digital world to function

200

What formula explains the relationship between voltage, current, and resistance? 

Ohm's Law
200

Why do data centers produce heat?

Computers and other resistive loads consume electricity and convert it to heat

200
What is the procedure review process, from author to final approval?

Author-Peer Review-EHS Review-Final Approver

300

What is the full escalation path for site-level events?

COT-ACOM-COM-Director-SVP-COO-CEO

300
How are AC and DC power different?

AC power alternates direction in a circuit, DC flows one direction. 

300

What is the difference between latent and sensible heat?

Latent heat is the thermal energy absorbed or released during a phase change, sensible heat is the thermal energy that causes a direct change in temperature

300

What are the three potential roles involved in executing a procedure?

Controller, Operator, CMS (Critical Maintenance Supervisor)

400

What is Human Error?

Human error is an action or decision that was not planned, not intended, or that causes a task or system to fail its goal

400

How does an arc form in a circuit? 

High Voltage or conductors ionize the surrounding air, turning it into a conductive plasma that allows current to jump between conductors. 

400

How is heat rejected from your data center? Explain the full heat path.

Rack-hot aisle-mechanical gallery-FCW-Chiller-Dry Cooler


400

What is the difference between stabilization and resolution?

Stabilization means that an event isn't getting worse, resolution means that the system has been restored to normal state.

500

What are the key rooms in a data center?

MMR-Data Hall-Mechanical Gallery-Electric Room-Chiller Plant-Fire Riser Room

500

Draw and explain your facility's electrical one-line, from utility to rack

N/A

500

Draw and explain the refrigeration cycle, including your facility's evaporator and condenser loops

N/A

500
Who communicates event details to the client?

The Client Success Manager