The deepest excavation that someone can enter without a Geotechnical Report or shoring.
4 feet (1.21m)
FLHA
Field Level Hazard Assessment
Number of blasts on an air horn to signal a medical aid
3
Decibel amount at which you need hearing protection
85dBA
Operator's blind side
Right
ERP
Emergency Response Plan
In addition to the Incident Report, what other form gets filled out for an MVI
Motor Vehicle Accident Report Form
Fall Protection is required if a worker may fall
3 meters / 10 feet
Near pressurized gas lines, when should hand digging commence
2 meters
PSSP
Project Specific Safety Plan
You take this with you to the Doctor after a workplace injury
TeksMed Passport
Found in concrete and asphalt while cutting
Silica Dust
Ensure this paperwork is completed before digging
BC One Call
EOHS
Environmental Occupational Health and Safety
First step after a gas line strike
Turn off all equipment, tools, or other sources of ignition
A ____ test is completed before performing atmospheric testing for a confined space entry
Bump
Don't use _____ tools to verify location of an underground utility
pointed/sharp
EOC
Emergency Operations Coordinator
Incident Commander at the yard
Steve Taylor
Maximum amount of time between check in calls while working alone
2 hours