Parts Management
T&R
Maint Activities
Publications
QC
10

Who is responsible for conducting the sub-inventory transfer of parts received from Supply to the appropriate section sub-inventory locator, once the parts have been picked up and Supply has placed them in the section's _STAGE?

Recieving section

10

_____________ are the essential skills that enable a Marine to perform in combat and qualify a Marine for training.

Core skills

10

Once equipment has been inducted, the burden of safe guarding and accountability rests with the _____________ until the equipment and all components turned in upon induction are properly returned to an authorized recipient (owner).

Maintenance Activity

10

Which technical publication contains instructions and procedures of a permanent nature on the operation, maintenance, and handling of equipment or material?

Technical Manual (TM)

10

What document captures the functionality of equipment being inspected?

Limited Techinical Inspection (LTI)


15

What is the required interval for validating maintenance sub-inventories' on-hand quantities?

Once every 2 weeks

15

_____________ are advanced functions that are environment, mission, or theater specific.

Core plus capabilities

15

What is one of the first steps a maintenance shop should take when accepting equipment into organizational maintenance?

Determine who the equipment owner is

15

The number "2" following the maintenance designator denotes what?

Example: TM 12345-12/2

Sequence number

15

Quality Control (QC) standards are found in what documents?

[Double Points!]

In the equipment operator's manual

&

In the equipment manufacturer publications

20

If parts used are not properly debriefed, they will remain on the GCSS-MC on-hand inventories in the area known as the_________ inventory.

Prepetual

20

_____________ are combat focused skills that are environment, mission, rank, or billet specific and are developed after a Marine is assigned to an operational unit.

Core plus skills

20

________________ is the exchange of selected serviceable repair parts/components from a deadlined item of equipment, for unserviceable repair parts/components from a like item with replacement.

Selective Interchange

20

When repairing an item, you notice it is missing a screw. What publication would you refer to for the screw requisition information?

SL-4 or parts TM

20

It is the responsibility of the _____________ to coordinate the establishment of a Quality Control (QC) program with the _____________ and _______________.

[Triple Points!]

Maintenance Management Officer, Commodity and Maintenance Officers

25

___________ are utilized as a holding area for items received from the supply section and waiting to be applied to ME on an open SR.

Layettes

25

_____________ are the essential collective functions a unit must be capable of performing during extended contingency/combat operations and are comprised of 3000-8000- level T&R events.

Core capabilities

25

When equipment requires ______________ and/or ______________ in order to be returned to a serviceable condition, a service request will be utilized.

[Double Points!]

Repair parts and Maintenance effort

25

How do you determine which equipment requires Preventive Maintenance Checks and Services (PMCS)?

Technical Publications

25

When an item fails the Quality Control (QC) inspection during the Closeout Phase:

[Double Points!]

The gear is returned to the Active Maintenance Phase

&

Reasons for failure are annotated on the service request

30

A Broken Unit of Issue ______________:

Is added to the DSI authorization letter

30

The T&R Manual contains the _____________ and ____________requirements to prepare units to accomplish their combat mission.

[Quadruple Points!]

individual and collective training

30

Where can you find how many or what type of units are in a Unit of Issue (UI) or Unit of Measurement (UM)?

QUP in FEDLOG

30

The letter "P" following after the maintenance indicator denotes that the publication contains what information?

Parts listing

30

Personnel assigned as Quality Control (QC) should be:

[Double Points!]

Appointed in writing 

&

Experienced with the equipment they will be inspecting