What colour APR cartridge is used to describe Particulate (High Efficiency/P100)
Pink or Magenta
Where was I born
Brampton
Where was GHD Founded
Melbourne, Australia
What tier system does this follow:
– inspections of sites or work in progress
–investigations and/or data collection
–monitoring/collecting samples and/or materials testing
-Site walk
Tier 2
What is the time gap between you and the car in front of you?
2 Seconds - this does not take into account road conditions.
What type of breathing apparatus is needed when:
Contaminant is unknown or not fully characterized
Potential IDLH conditions exist
Oxygen concentration may be unsafe
SCBA
How many states have I traveled to for work?
4
What year was GHD founded
September 24, 1928
What must happen when GHD staff are on Site for all tiers?
Develop tailgate and a risk assessment
How many PIs does an employee need to submit to be entered into the GHD SWAG draw?
3
The standard list to reduce hazards, known as the Hierarchy of Controls
1. Elimination
2.
3. Engineering Controls
4. Administrative Controls:
5.
2. Substitution
5. Personal Protective Equipment (PPE)
what Mountain am I climbing in the end of February
Pico De Orizaba - (Mexico - half points)
How many full-time employees does GHD have? (1000s)
12000+
Working on rail corridors falls under which category
Tier 3
How many PIs did Ontario (1155 FTE) have in the month of December?
3400 - Note third best ratio per FTE. Behind Central US and Southeast
How far must a ladder extend out of an excavation
3 Feet
I graduated from what University?
- Bonus - what year?
Carleton University
2023
GHD operates in how many countries?
14
When GHD has Vendors on site, what is the minimum tier class?
Tier 3
How many first aid incidents did Ontario have in the month of December?
ZERO
26 in 2025
What is the TWA, STEL and IDLH for Benzene
0.5ppm, 2.5ppm and 500ppm
Does anyone know what's happening in April?
Transferring to the Calgary office
GHD core values (TRIC)
Teamwork, Respect, Integrity, and Commitment
What are the Project Team Member responsibilities (4)
- compliance with the project risk management documentation.
- awareness of safety and environmental issues during the project execution,
-activating Stop Work Authority (HSE369) as required
-reporting of incidents and hazards
How many CCVs were completed by Ontario staff in December?
Only 1
12 over 2025