This system is set in place to ensure all CLs and quality checks are in specification/range
Proficy
This system allows P&G personnel to input materials into this database that does not align with specifications and causes unplanned downtime due to defected material
COM - Complaint on Material
This start up check ensures the weight of our gummies meets our specifications
Average Gummy Weight
This sample must be taken during bulk batch changes.
micro sample.
This logbook entry shows pit stop/RLS was performed.
"E" or non-product contact cleaning
This standard shows all GCAS numbers and what materials associates with it including substitutions
FPP
This standard assists with defect classification
QAC
This hourly check ensures the seal is sealed completely around the mouth of the bottle and no burn marks are present
Area 4 Attributes
This inspection requires "x" amount of bottles in Area 3 during hourlys.
12
This action must be taken when QIMS is not readily available.
perform back up paperwork.
This system manages inventory consumption during production for reconciliation purposes
MCT
This physical location is where gummies place their defected material
Behind line 9 or top of gummy tunnel
This timeframe is allotted to complete quality inspections without entering a memo
30 minutes
Area 4 consists of "x" bottles when performing hourly inspections.
63.
This vault is where all GMP and Non GMP documents are stored.
Veeva
This standardized operating procedure includes the defect flow chart and action steps with classified defect
PKG-SOP04383
This step must be taken when campaign length exceeds campaign length duration.
Stop production and product contact clean immediately.
Corrugate must be marked with this term while performing start up checks at the casepacker.
Test
This must be performed prior to taking samples.
Hourly inspections.
SOP02945
This standardized operating procedure states all gummy packing quality procedures
PKG-SOP04371 Gummy Packing Lines Quality Control Operations
This time frame is the validated campaign length for Gummy Packing Lines
96 hours.
HH:MM; MM/DD/YYYY format.
This constitutes as a major defect for container label per the QAC
Count, UPC barcode or brandcode is missing, illegible or incorrect on one or both sides of container.
This must be done in Proficy when production line is under validation, APD (Authorized Planned Deviation), ATS (Authorized Temporary Standard) or an EO (Experimental Order).
Mark "Yes" and enter applicable memo. Ensure ATS/APD include expiration date. If "No" then mark "NA" in appropriate inspection.