Culverts
FRPA
Boating
Fish ID
Misc
100

What is an invert?

Elevation of the inlet or outlet
100

What is the standard buffer width of an anadromous stream on private land?

66 ft

100

What is the first thing you do when the boat engine doesn't start?

Jiggle the shifter

100

Fish 1

Arctic Grayling

100

When visiting a project location, such as a bank stabilization, which data layer do you add to?

Site Visit

200

What is the minimum size culvert that infill can be placed inside

4 ft

200

What is the standard buffer on an anadromous stream on state forest land?

100 ft

200

What is the first thing you do when the engine dies?

Assess if immediate danger is present and throw an anchor out or fire the kicker up to maneuver the boat to safety.

200

What are the key aspects that distinguish between a cutthroat trout and a rainbow?

Pigment breaks in the adipose fin

Length of the maxillary
200

Why is it not appropriate to add site visit data to the main stream survey layer?

Some information collected in the site visit layer is not public. We have to share the main stream survey layer publicly due to grant reporting requirements.

300

What stream ecosystem factors are impacted by improper culvert design?

Restriction of aquatic organism movement, size selection of fish able to transit the culvert, modifying the sediment regime, and restriction of natural channel migration.



300

Describe the DPO process.

Review DPO, comment on likely streams and available data, survey with 30 days, find barriers, schedule site visit.
300

Name the components of a float plan.

Crew, Comms, ETA, primary destination, Boat, launch, and bonus objectives


300

Fish 2

Burbot

300

Please describe what is saved and where it is saved when closing out a project

Project folder - permits, trs, relevant emails, maps, applications, relevant documents, notes


Permit folder - final permit (pfd)

Database - review dates, basic project info.




400

Why is DOT switching to aluminum culverts and what are the benefits and drawbacks

Pros - corrosion resistant, likely to last 75 years

Cons - fragile, easily bent by snow plowing and during installation, expensive, very hard to reuse

400

State the gradient barrier specs

9% for 100 ft (pink and chum)

12% for 225 ft

16% for 100 ft

20% for 50 ft

24% for 25 ft

400

What is the minimum safety equipment we must have on the boat?

Life jackets, throwable, flare, GPS, comms, robust tool kit, knife, horn, self

400

Fish 3

Alaska Blackfish

400

What is the standard maximum approach velocity we require on water intakes?

0.5 ft/sec

500

Name 8 key components to consider when permitting a culvert

Alignment, grade, width, substrate composition, location within the stream continuum, erosion potential, necessity of the culvert, alternatives

500

If you are surveying a stream with coho salmon and encounter a 7.5 ft waterfall, what is the minimum depth the jump pool would need to be to not be considered a barrier?

9.375 ft

1.25 X fall height

500

Name of the 5 common mechanical issues and their remedy

Water in the gas - drain fuel water separator

Loose electrical connections - check connections starting in the battery compartment

Gradual loss of electrical power - corrosion! Search for it and remove it with a brush and apply dielectric grease

Overheating - check the water intake ports, bad impeller, clogged water tube, bad thermostat.

Sluggish under power - boat too heavy (check the holds for water), lack of fuel getting to the block (check fuel filters), fouled spark plugs (clean off plugs or replace)

500

Fish 4

Chinook on left, coho on right

500

Describe the process in issuing an Over the Counter (OTC) mining permit when Kate or Greg are not available.

Determine if stream needs timing window - check catalog, and other data to see if the area has spawning fish. Inform applicant of other local restrictions.

Print out OTC form, have applicant fill in information, assign permit numbers - one permit per stream, fill in timing windows, sign, scan, give to applicant, email out to CC list, put in permit file, and add copy to projects by community folder.