Quarry Travel
Non-Routine Tasks
GHS
Model Programs
Emergency Response
100
This has the right of way on the quarry road
What is "Quarry Mobile Equipment" or "Loaded Quarry Mobile Equipment"
100
Name of the USG Program related to stopping and going through potential hazards of a non-routine task
What is "Take 5"
100
GHS is the acronym for this
What is "Globally Harmonized System"
100
This model program contains the steps related to isolating energy sources on machinery.
What is "Lockout Tag out Model Program"
100
Tornado shelter in the Mill.
What is the "Mill Shop"
200
Berms must be at this height
What is "Mid-axle of largest tire"
200
This is required to be completed and signed before entering an area/room with limited entries and/or hazardous conditions.
What is a "Confined Space Permit"
200
Meaning of this pictogram:
What is "Harmful"
200

This Model Program helps you listen for clues.

What is "Hearing Conservation Model Program"

200
First thing you should try to do if there is an active shooter on site.
What is "Run"
300
MSHA allows small openings in berms for this
What is "Water Drainage"
300
Defines a non-routine task
What is "A task that's done less than once a week or for the first time"
300

The material available in the workplace that provides comprehensive information about a chemical product

What is "Safety Data Sheet or SDS"
300
Shelves must have weight ratings posted on them in order to comply with this model program
What is "Racking Model Program"
300
Where employees working south of the railroad tracks in the Quarry should go in case of a tornado.
Where is the "C3 Tunnel"
400
The signs on the blasting truck when it is transporting explosives are this color
What is "Orange"
400
This accompanies the Take 5 form
What is a "Risk Meter"
400
The company which holds and organizes all of our chemical classification and labeling resources.
What is "3E"
400
Training on front-end loaders at least every 3 years is mandated in this model program
What is the "Mobile Equipment Model Program"
400

Employees working north of the railroad tracks in the Quarry must go here in case of a fire.

What is the "(Furthest) Active Face"

500

You should do this when entering the pit

What is calling "entering Flintkote Pit" on the radio?

500

Name 3 steps that should happen before starting non-routine task

What are "Scheduling, job planning, Kitting, task-specific safety huddle, SOC and Take 5 (Reviewing VWIs)" 

500
The year in which GHS was internationally agreed upon
What is "1992"
500

This three letter acronym will help you "keep on truckin"

What is the "CDL Model Program"

500
The three places a "Quarry Evacuation Map" can be located.
Where are "the Flintkote Breakroom, the board by Quarry Maintenance Supervisor office, and the board by the Quarry Office Front Door/Offices"