Your move, IC
Name that nasty
When I move, you move
No one knows what it means
Goulash
100
You choose to take direction action to stop the release at its source 

What is an offensive strategy 

100

Burning of the eyes, respiratory tract; commonly used for crowd control and often dispersed as an aerosol 

What is a RCA

100

Area around there release where contamination is present and only trained, properly protected personnel can enter

What is the hot zone 

100

ICS

Incident command system 

100

Disintegration, runway linear cracking, container attachments open, container puncturs

Breach events 

200

Conditions are too dangerous, resources are insufficient, and any action would likely result in responder harm without meaningful benefit. You choose to monitor and isolate only

What is non-intervention

200

Exposure to this damages the membranes of the lunits and can lead to “dry land drowning”

What is a choking agent 

200

The decon line is here

What is the warm zone 

200

NIMS

National information management system

200

Type and location of the breach, quantity and flow characteristics, rate and duration of the release, weather conditions

release considerations 

300

During operations, conditions change nd risk increases beyond acceptable limits, forcing you to shift strategy midd-incident

What is dynamic risk assessment / strategy reevaluation 

300

Interferes with the body’s ability to use blood at the cellular level

What is a blood agent 

300

Civilians are told to remain inside of buildings and close windows 

Shelter-in-place

300

CHRIS

Chemical hazards response information systrem

300

The general course of action, direction, or plan yo accomplish the incident objectives and priorities 

Strategies 

400

Information obtained from beyond the inner perimeter

Defensive recon 

400

Loss of muscle control due to exposure to an organophosphate compound 

What is a nerve agent 

400

This type of evacuation would be the best option if the HAZMAT is leaking inside the building and the material is flammable or toxic or the state of the HAZMAT makes it hard to control

What is limited scale evacuation 

400

CAMEO

Computer assisted management of emergency operations 

400

Establish the intended outcomes in a specific operational period 

incident objectives 

500

A valve is shut, but pressure builds in the container, creating a new hazard

What is risk transfer 

500

CWO2 Cosby has a carpenter bee that lives outside her back door. It is big, fat, travels slow, and only poses an internal risk. She named it after this type of particulate radiation.

Apha 

500

Transportation, relocation facility, and information are three of the four critical issues that must be addressed and managed effectively in a full scale evacuation. This is the fourth.

What is alerting and notification 

500

ALOHA

area locations of hazardous atmosphere 

500

Release rate of < 0.01 second versus release rate of 0.01 to 1 section 

Detonation versus violent rupture