Terminology
Terminology 2
Functional Area
Access Management
RAB & ICE
100

This Manual defines capacity

What is the Highway Capacity Manual

100

DHV is used for this

What is to determine the number of traffic lanes on a roadway (because it represents the peak volumes that the facility should encounter)

100

These are the four major roadway functional classes

What is freeway, arterial, collectors, local streets

100

These are the three types of access control

What are full, partial, and permitted

100

A roundabout will always provide a _____ capacity and _____ delays than AWSC operating with the same traffic volumes and right-of-way limitations.

What is Higher and lower

200

These are the factors that influence capacity. 

Lane widths/design speed/traffic composition/ number or type of lanes/ terrain/ geometry/ control type/ passing zones/ location/ access density

200
Presents information about the worksheet.
What is status bar?
200

In this stage of design traffic counts are requested

What is concept

200

These three components make up the total length of the upstream intersection functional area

What is perception Reaction , maneuver, stopping/queuing/storage length

200

These are common roundabout shapes

What is circle, ellipse, teardrop, peanut, dog bone

300

This is how capacity is rated

What is Level of Service (LOS)

300

This is density (in relation to capacity)

vehicles per mile

300

These are the LOS categories

A-F

300

These factors affect control delay

Control
Geometrics
Traffic
Incidents. 

300

These projects don't require ICE to be performed (give two)

-Resurfacing
-Signal timing and maintenance
-Signal Permit revision w/ no changes to physical footprint of intersection
-Sidewalk/streetscape improvements
-Bridge replacement (with no realignment or relocation of intersection)

400

These are the two types of flow.

What is interrupted and interrupted flow

400

This is an interrupted flow facility

What is a traffic signal?
(Ped crossing, ramp intersection, new interchange, off street ped & bike facility)

400

This is the GDOT preferred LOS

What is LOS C

400

These are the components of a two stage gap acceptance intersection

-Two-part intersection
-Minor street vehicle crosses one direction of the major street traffic
-Storage in median
-Waits for a 2nd gap in the other in the other direction of the major street traffic

400

Roundabouts have this many conflict points compared to a signalized four leg intersection that has 32

What is 8

500

This is the formula for AADT

Total vehicles/ 365 days

500

Level of Service F an also be referred to as this. 

What is Over saturated Flow

500

The typical speed design range for a 4 lane arterial highway in a rural area

What is 55-65mph

500

This is when an exclusive right turn is provided

What is a when right turn volume exceeds 300vph and the adjacent through volume exceeds 300 vph per lane

500

These are four intersection alternatives in ICE

-Minor stop
-all way stop
-RIRO
-Signalized
-RAB
-RCUT
-MUT
-Green T
-DLT/CFI
-Jug handle
-Diamond