Phase 1
Public Relations
Staffing Needs
Equipment
Surveys
100

The Phase I survey represents “a reasonable and good faith effort to identify _____ that may be affected by the undertaking”

What is, historic properties.

100

Prior to field work, two types of local contact may be needed 

What is land owners and utilities 

100

All aspects of standard fieldwork equipment, assembly and maintenance.

What is, field labor. 

100

The standard, handheld range finder remains the most common piece of positioning equipment 

What is, a compass?

100

All projects are accompanied by ______ showing the location of the project. 

What is, a map. 

200

In practical terms, the purpose of the Phase 1 survey 

What is, to see whether archaeological resources are present within the surveyed area. 

200

This is something augmented by public notice, such as a local newspaper 

What is, publicity 

200

Coordination and assignment of project personnel, and monitoring of project. 

What is, project management. 

200

Some _____ issue to each crew members most of the equipment needed.

What is, firms. 

200

These are widely spaced, small tests that are little more than a few shovelfuls of fill removed. 

What is, a shovel test. 

300

The results of the Phase 1 survey provide the starting point for

What is, all subsequent archaeological resource management decisions. 

300

It is risky to rely of land owners _______ to verify buried utility infrastructure.  

What is, knowledge

300

Background research into history and pre-history of the project vicinity 

What is, cultural backgrounds. 

300

This is required for Federal contracts

What is, first-aid/CPR training.

300

This must be conducted to review and prepare for potential hazards. 

What is, a health and safety meeting. 

400

The Phase 1 information also helps to decide whether the project area contains archaeological remains that satisfy the criteria for listing on 

What is, the National Register of Historic Places. 

400

Housing developments should have these to show locations of utilities and septic systems.

What is, maps. 

400

Preparation of correspondence and coordination in communications. 

What is, secretarial. 

400

This is needed if working on a construction site or highway corridor.

What is, a hard hat. 

400

Existing roads and other landscape features can help in orienting the 

What is, the grid.