Slabs
Shoring
Decks
Shoring 2
100

Both structural slabs and slabs-on-grade must support both their own weight plus a live load?

False

100

Shoring is not removed from beneath a slab until the concrete has reached?

A specified strength, usually 75 or 80 percent

100

With reasonable care, plywood forms with an HDO surface often can be reused more than?

50 times

100

Prior to placing concrete on a hand-set or flying deck, the deck must be?

Leveled

200

One-way solid slabs are usually used for spans of less than?

20 feet

200

A column capital is an architectural rather than a structural feature?

True

200

The fastest type of decking to hand-set and strip is the?

Panelized deck system

200

   ______ can be performed by one person and a rotating-beam laser level set up at various spots near the center of the deck?

Grading

300

Beams that are wider than they are deep are called ?

Slab bands

300

To aid in form stripping, some dome pans are equipped on the underside with a?

Valve

300

Platforms cantilevered outside the building for use as material-staging areas are supported with?

Outriggers

300

_______ are often used in conjunction with frame shores by placing them in U-head screw jacks installed at the top of the uppermost frame members?

Stingers (beams)

400

A structural concrete slab frequently used for parking decks is the?

Two-way flat slab

400

When preparing slab or beam joist forms for concrete placement, form oil should be applied to all components except?

Reinforcement

400

All blockouts and deck penetrations must be approved by the?

Structural engineer

400

To prevent lateral loads from being imposed upon shores, they must be?

Vertically plumbed

500

One-way joist slabs can have a span with a width of up to?

45 feet

500

Long versions (up to 16') of pan forms are used to?

Improve the finished appearance by minimizing lap joints

500

Jacks most commonly used with column-mounted tables are rated to support a working load of?

50,000 pounds

500

Indicators that may signal impending deck failure include all of the following except?

Discoloration