DWRS
TRAFFIC CONTROL
SW3P
PLAN READING
100

WHAT PROGRAM IS THE OFFICIAL RECORD FOR TXDOT?

SITEMANAGER

100

WHAT IS THE MINIMUM AMOUNT OF BARRICADE INSPECTIONS REQUIRED FOR A PROJECT?

2 - 1 NIGHT AND 1 DAY

100

HOW DEEP IS SILT FENCE FABRIC EMBEDMENT?

6 INCHES

100

WHAT DOES CSJ STAND FOR?

CONTROL SECTION JOB

200

TRUE OR FALSE:

DIONNE CAN GET DENNIS TO ENTER A DWR WHILE DIONNE  IS VACATIONING IN JAMAICA.

TRUE

200

WHEN USING A PCMS FOR A 2 WAY ROADWAY, WHERE ARE THE BARRELS SUPPOSED TO BE PLACED?

2 BARRELS IN FRONT AND THE BACK OF PCMS

200

HOW DEEP IS A ROCK FILTER DAM EMBEDDED?

4 INCHES

200

TRUE OR FALSE:

NORTH ARROWS ARE REQUIRED ON ALL PLAN SHEETS.

FALSE - ONLY NEEDED FOR SHEETS THAT HAVE MAPS OR PLAN VIEWS

300

TRUE OR FALSE:

DUKE JUST FINISHED INSPECTING A TRAFFIC SWITCH THAT STARTED ON MONDAY NIGHT AND ENDED ON TUESDAY MORNING. DUKE WILL ONLY HAVE TO DO ONE DWR FOR THIS WORK.

FALSE - 2 DWRS WILL HAVE TO BE DONE...MONDAY NIGHT'S WORK ENDS AT 2400 HOURS (MIDNIGHT OR 12AM) AND TUESDAY'S WORK STARTS AT 0000 HOURS (12AM)

300

TRUE OR FALSE:

A NEWLY MOUNTED SIGN THAT IS 10 FT FROM THE BOTTOM OF THE SIGN TO THE EDGE OF TRAVEL LANE IS INSTALLED CORRECTLY.

FALSE - IT SHOULD BE 7 FT - 9 FT

300

WHAT FORM IS DESIGNED TO HELP WITH SW3P  COMPLIANCE?

FORM 2118

300

TRUE OR FALSE:

THE BASIS OF ESTIMATE IS INFORMATION ON HOW A DESIGNER COMES UP WITH THE QUANTITIES ON A SET OF PLANS

TRUE

400

WHAT MANUAL WOULD YOU FIND THE INFORMATION REQUIRED FOR A DWR?

CONSTRUCTION CONTRACT ADMINISTRATION MANUAL (CCAM)

400

TRUE OR FALSE:

A SIGN SHOULD BE VISIBLE IN BOTH THE DAY AND THE NIGHT.

TRUE - TMUTCD STATES A SIGN SHOULD BE LEGIBLE AT NIGHTTIME AND DAYTIME

400

WHAT ITEM COVERS TEMPORARY EROSION, SEDIMENTATION AND ENVIRONMENTAL CONTROLS?

ITEM 506

400

WHAT SHEETS IN THE PLANS SHOW BARRELS AND CONE REQUIREMENTS FOR A PROJECT?

BC SHEETS

500

TRUE OR FALSE:

JAMES AND CLARK ARE INSPECTORS ON THE SAME PROJECT AND THEY ARE WATCHING THE SAME WORK OPERATIONS (RCP INSTALLATION). THEY ARE BOTH REQUIRED TO DO A DWR FOR THE WORK THEY OBSERVE. 

FALSE - DUPLICATE INFORMATION IS NOT REQUIRED.

500

HOW TALL ARE THE DELINEATORS REQUIRED TO BE ON LOW PROFILE CONCRETE TRAFFIC BARRIERS?

16 INCHES FROM THE TOP OF THE CTB TO THE TOP OF THE DELINEATOR

500

WHAT DOES E.M.S. STAND FOR?

ENVIRONMENTAL MANAGEMENT SYSTEM

500

WHERE CAN SPECIAL PROVISIONS AND SPECIAL SPECIFICATIONS FOR A PROJECT BE FOUND?

THE PROPOSAL (CONTRACT)