What year was H&P established?
H&P was established in 1920 by Walt Helmerich ll and Bill Payne who met on oil rig in South Bend, TX
What does acronym PSMS stand for?
Personnel Safety Management System
What is the function of Blind Rams?
To seal off the open hole
What is the kickoff point?
is where the well deviates from vertical
mention two types of drill bits
Currently in the drilling industry, there are two main categories of drilling bits: rolling cutter bits and fixed cutter bits. Plus, bit sizes vary from 3-7/8 inch to 36 inches.
Fixed Cutter Bits or PDC(Polycrystalline Diamond Compact)
Rolling cones or rolling cutter bit
what RSMT stand for?
Rig Safety Management Team
What is the focus of PSMS?
To eliminate Life Altering Injury.
What is a “flow check”? and when it needs to be done?
Observing the well for flow after the pumps have been shut down.
before pull off bottom, at csg shoe, before L/D BHA,
and anytime the displacement is not accurate.
What is EDS on an oil rig?
emergencies disconnect system/sequence
what size is our flow line?
12 inch
What is C.O.A.C.H
care, observe, approach, converse, help
What is a MERP and Where is Located?
Medical Emergency Respond Plan.
safety Trailer, RM House, OS Office, Drillers Cabin.
What is the BOP stack rating?
10k
Explain Hard Shut In and Soft Shut in.
Hard shut in is when while drilling the choke stay closed
Soft shut in is when while drilling the choke stay in the open position
What is and What size are the VBR's in the BOP?
Variable Bore Rams 3 1/2 - 5 1/2
is a component that can seal around drill pipe and other tubulars of varying sizes
Which are the H&P core values?
Actively Care
Service Attitude
Innovative Spirit
Teamwork
Do the right thing
IN THE SAFETY IN THE MOMENT FLOW CHART WHEN DO WE STOP WORK AND DISCUSS
WHEN WE ENCOUNTER HOLD POINT OR TRIGGER
Primary- drilling fluids
Secondary- BOPs, well head, casing, cement
on 7500 psi rigs, what is the pressure range on the rig Standpipe Transducer
0-10k
what is the minimum length for saver sub that we can use on ours tds?
The minimum saver sub length
is 7.5 inches
what are the 4 permits available electronically on eSAFE
LO/TO/TO
Hot Work
Confined Space
Overhead Tools Checklist
What is AAR? What are the 4 Questions?
AAR- After Action Review: brief learning process conducted immediately after completing LAI potential task or critical action.
1.What was supposed to happen?
2.What actually happened?
3.What were the differences?
4.What can we learn?
Why is it important for crew members to immediately inform their driller if they see any potential well control problems
To help driller identify and act to minimize the size of a kick
What Is The PSI Rating For The Rotate Head?
Dynamic and Static?
3000 static
1500 dynamic
What size is the rotary table? and what kind of energy it needs to operate?
27.5” Hydraulic Rotary Table