Working at Height
Incidents
Risk Management
Technical Safety
HSE Programs
100

A PFAS consists of three components: A Class III full-body harness with a deceleration device (such as a shock-absorbing lanyard or inertia reel) attached to suitable attachment point.  PFAS stands for what? 

Personal Fall Arrest System (PFAS)

100

Minor cuts, scrapes, or scratches; a minor burn, the use of non-prescription medication would fall under which injury classification? 

First Aid Treatment

100

Elimination, Substitution, Engineering, Administrative and Personal Protection Equipment

Hierarchy of Hazard Controls

100

LINXS has how many Life Critical Operations?

Nine Life Critical Operations 


100

What HSE Program does LINXS have that represents the operations that present the greatest risk of a fatality or serious injury. 

Life Critical

200

All components of a PFAS must have a minimum breaking strength of what? 

5,000 lbs. (22.2 kN)

200

Incidents are classified in three categories, what are they? 

(People) (Environment / Community)  (Equipment Property)

200

__________ is a process that identifies hazards associated with each step of a job and develops solutions for each hazard that will either eliminate or control the hazard before the task goes to field. 

Job Safety Analysis (JSA)

200

The HSE Project Lead will develop a (DOPP) that systematically addresses the means and methods for preventing tools and materials from striking others during overhead work activities.  What does acronym DOPP Stand for? 

Dropped Object Prevention Plan (DOPP)

200

This Program is based upon proactive (leading) safety metrics that encourage worker involvement in HSE and reporting of hazards and incidents.  This Program is for demonstrating outstanding safety Performance and going above and beyond in HSE.   


HSE Incentives, Awards and Recognition Program

300

Lanyards used in PFAS will be designed and used to limit a person’s fall to no more than how many feet? 

6 Ft. (1.8 m)

300

What does the acronym TRIR stands for?  

Total Recordable Incident Rate 

300

__________ is the process of identifying and communicating to each worker the task steps to be completed, the hazards and risks associated with the task, and the safe work practices that are to be applied to complete the task safely and in an environmentally acceptable manner. This is completed and updated daily. 

Safety Task Assignment (STA)

300

25 lbs/Ft2 (1.20kN/m²) describes what type of Scaffold?

Light Duty Scaffold

300

What is the name of the Program that is for reporting and correcting hazards on the Project by scanning a QR code?

See Something, Say Something

HCSS

400

Limit worker’s approach to perimeter edges or other fall hazards in order to prevent a fall from occurring is called what? 

Fall Restraint Systems

400

What is the APM TRIR Project Goal? 

0.90

400

This Document is issued prior to starting work in order to verify that adequate planning has been completed to conduct the work in a safe manner. This document is required for High Risk Work and is an agreement from multiple organizations.    

Permit to Work

400

Under Excavation, Trenching and Shoring, what is the maximum allowable slope for the soil or rock type Stable Rock? 

Vertical, 90 degree sides.  

400

The Project Lead will implement this program to control occupational diseases caused by breathing air contaminated with harmful dusts, fogs, fumes, mists, gases, smoke, vapors, and sprays.

Respiratory Protection Program

500

___________ will be approved by a Competent Person to meet the strength requirements, or a recognized typical structural member

Anchorages

500

If an object weighing 10 pounds fell from a 50 foot elevation landing within 2 feet of a worker, what would be the potential incident severity classification? 

Potential severity Level 4 

500

Design modification, Guards, Permanently fixed physical barriers, physical barriers, Isolation are all examples of what type of controls? 


Engineering Controls

500

Crane Lifts over operating process lines or equipment is called what type of lift? 


Critical Lift 

500

This Program is designed to protect personnel from APM Vehicle Movement, Potential Switch Movements and Energized Power Rail.  

Track Allocation Program