Early Season Prep
One Week Out
72–24 Hours Out
12 Hours & Evacuation
Post-Storm Actions
100

This weather tool must be portable and on-site before hurricane season.

What is a portable weather band radio?

100

How many hours before the storm should employees be released to prep their homes?

What is 24 hours?

100

What must be confirmed about all employees?

What is their emergency contact info?

100

What must be shut off before the site is evacuated?

What is power, water, and gas?

100

This company should be called to begin the post-storm assessment.

Who is Zurich?

200

This team should be organized before June 1 to inspect for damage.

What is the damage survey and repair team?

200

These individuals should be contacted about unsecured trailers.

Who are the owners of the trailers?

200

Why might you need to remove sediment protection from drains?

What is to handle heavy runoff and flooding water?

200

What must be backed up and secured to prevent data loss?

What are computer files?

200

This team assesses site damage and prioritizes repairs.

What is the damage survey team?

300

This plan ensures staff can be contacted after a hurricane.

What is the post-hurricane employee mobilization plan with phone tree?

300

This organization may perform a pre-storm assessment.

Who is Zurich?

300

What should be checked and backed up in case the power goes out?

What is the jobsite radio and extra batteries?

300

Why must fuel cans and electrical systems be secured or shut down?

What is to prevent pollution and electrical hazards?

300

These types of hazards are addressed first.

What are Class A hazards?

400

This action helps determine which work should be delayed or protected ahead of a storm.

What is identifying vulnerable work?

400

Why should scaffold planks be removed and open excavations minimized?

What is to prevent wind or flood damage?

400

What should you do with generators and pumps?

What is confirm they work and are protected from water?


400

Where should heavy equipment be moved to reduce damage risk?

What is offsite or to a remote, safe area?

400

This organization may be contacted to help employees after a storm.

What is the Red Cross?

500

What should be done with necessary supplies before June 1?

What is procure and store them?

500

This group must inspect the site for hurricane readiness.

Who are trade contractor hurricane team members?

500

What should you do with loose construction materials like scaffolding, rebar, and forms?

What is bundle, strap, or remove them from site?

500

What should guide how and when the team leaves the site?

What is the evacuation plan and phone tree?

500

This plan is used to communicate with employees after the storm.

What is the post-hurricane employee mobilization plan?