Scope Creep
Herding Cats
Big E little p little c
Trust, But Verify
Field Reality
100

Work expanding beyond contract without approval.

What is a scope creep?

100

Internal team HV coordinates instead of vendor.

Who is Procurement?

100
Equipment that drives substation schedule. 

What is the power transformer? 

100

Indicates latest drawing version.

What is the revision number?

100

Submitted when field conditions differ.

What is an RFI?

200

Document to review before accepting new requirements.

What is the contract (or scope of work)? 

200

Consultant for revenue meter form clarification.

Who is the metering consultant?

200

Required vendor documents before fabrication.

What are approval drawings? 

200

Conflicting info between drawings. 

What is a discrepancy?

200

Drawings showing what was actually installed.

What are as-builts?

300

Risk when assumptions aren't documented.

What is an undocumented assumption?

300

Entity that clarifies interconnection requirements. 

Who is the utility? 

300

First person HV coordinates with when delivery shifts.

Who is the project manager?

300

Review ensuring discipline alignment. 

What is a coordination review? 

300

Design-phase review to prevent install issues.

What is a constructability review?

400

Formal action before redesign begins.

What is a change order?

400

Specialist for PRC compliance questions.

Who is the NERC consultant?

400

Review ensuring HV plans match other disciplines. 

What is a cross-discipline coordination review?

400

Note clarifying approval doesn't transfer EOR responsibility.

What is 'Approved as Noted'?

400

Installed equipment lacks required working clearance violation? 

What is a clearance violation?

500
Failure when responsibilities aren't clearly defined. 

What is scope ambiguity? 

500

Only entity that can approve scope/cost deviations. 

Who is the client?

500

Risk when long-lead items identified too late.

What is late long-lead identification? 


500

Decisions discussed but never documented.

What is failure to document? 

500

HVB design-phase filter between EOR and construction.

What is Engineering for Construction?