100

MMD Policy and Procedure 111-35 outlines the steps for identifying this population of individuals, recommends translation and interpretation services, and allows for meaningful public participation.

What is Limited English Proficiency

100
This part of 40 CFR outlines the RCRA Transporter Regulations.
What is Part 263.
100

This form is used to obtain, update, or re-verify a hazardous waste or LIB site identification number.

What is EQP 5150.

100

Which part of 40 CFR regulates Generators

What is Part 262.

100

Ignitability, Corrosivity, reactivity, and toxicity

What are hazardous waste characteristics

200

MMD Policy and Procedure 111-34 ensures the equitable treatment and meaningful involvement of all people by identifying the stressors and demographics within communities that may impact environmental conditions or the public health of residents.

What is Environmental Justice Analysis

200

This is designed to track hazardous waste from generator to TSDF.

What is a waste manifest.

200

This is used by TSDFs that wish to obtain a Hazardous Waste Operating License.

What is EQP 5111 (hazardous waste operating license application).

200

This type of generator may accumulate hazardous waste on-site for 180 days without a permit.

What is a small quantity generator.

200

Wastes from non-specific industrial sources (ex. spent solvents, dioxin-bearing wastes, or multi source leachate)

What is F-Listed waste?

300

MMD Policy and Procedure 111-01 provides details regarding how HWS staff conduct inspections to document facility compliance after final corrective measures have been implemented.

What is Corrective Action Monitoring and Maintenance.

300

A transporter is forbidden from transporting hazardous waste if they do not have this.

What is an identification number / site ID.

300

If you'd like to register as LIB, you'll need one of these.

What is EQP 5122.

300

This type of generator may only accumulate waste on-site for 90 days, without a permit, but does not have a limit on the amount of hazardous waste accumulated on-site.

What is a large quantity generator.

300

Hazardous wastes from specific sectors of manufacturing and industry (ex. wood preservation, explosives manufacturing, or pesticides manufacturing)

What is K-Listed waste?

400
MMD Policy and Procedure 111-33 identifies statutory timeframes, technical reviews, provides public input opportunities, and documents accountability in decision making for any TSDF applying for what?

What is a hazardous waste operating license.

400

A serious transporter spill of hazardous waste requires the transporter to notify _____________?

What is PEAS / NRC.

400

This is required monthly to summarize waste generated, treated, or stored on-site.

What is EQP 5142.

400

This occurs when a generator exceeds or falls below their normal generation limits in any given calendar month.

What is an episodic event.

400

Discarded commercial chemical products, off-specification species, and spill residues.

What is P- and U-Listed Waste?

500

MMD Policy and Procedure 111-30 identifies the procedures staff are to use when collecting and analyzing soil, groundwater, surface water, waste, and other media in order to obtain data that are representative, scientifically valid, and defensible in a court of law.

What is QA/QC manual.

500

Shipment via ________ does not require a manifest to physically accompany the waste at all times.

What is water and rail.

500

This form is used for Emergency Operating Licenses

What is EQP 5113.

500

This allows a generator to accumulate hazardous waste at or near the point where it is initially generated and collected during daily operations, but is limited to 55 gallons of hazardous waste.

What is satellite accumulation / satellite accumulation area.

500

Specific materials such as household waste, agricultural wastes, and certain recycled secondary materials

What is excluded waste.