How much do you know about Hytec
LLL
Industrial
Employees and Culture
Terminologies
100

The year that Hytec first started

1994

100

LLL stands for

Life-Long Learning

100

Longest FAE employee under Industrial 

LARRY

ZALDY


100

Full name of our newest member in Hytec

Kimberly Ann Albay Ramones

100

CMO

Ched Memorandum Order

200

Before HPI it was named


Full name of company

Smart Process Integration

200

Name 5 specializations that has a complete laboratory set-up

K-12, Sciences, Electrical, Allied Courses, Mechanical, Chemical Engineering, Food Technology, Civil, Fabrication Technology, Industrial, Aeronautical, Agriculture, ICT, Mechatronics, Maritime

200

what is the first product sold by HPI

Toyooki


200

Longest tenure employee in Hytec

Sir Jojo, Ernesto M. De Guzman

200

PPE

Personal Protective Equipment

300

First Exclusive Distributorship

TII Technical Education or De Lorenzo

300

Name at least 5 Principal that we have under Mechanical Engineering. 

Amatrol, EMCO, K&H, Yalong, Lab-aids, PA Hilton, DAC, Chester, Essom, Famic (Automation Studio)

300

Name at least 5 categories of specializations under Industrial 

1. BOLTING SOLUTION

2. CONSTRUCTION

3. CORROSION PROTECTION

4. MACHINE SHOP

5. ELECTRICAL SYSTEM

6. INSTRUMENTATION

7. TRAININGS

300

The year Ms. Mhae Macero started in HYTEC POWER INC. 


2012

300

LMS

Learning Management System

400

The first Memorandum of Agreement (MoA) signed between HPI and what Educational institution


AMA Education System

400

Top most salable Product/Principal in 2020

VEX ROBOTICS 

400

Name 5 of the Major Principals that we have

1. SPX FLOW POWER TEAM

2. SPX FLOW 

3. MOMENTO

4. NORBAR

5. EXPANDER

6. NORD LOCK

7. BOTLIGHT

8. SUPER BOLT

9. CHESTER

10. TAG

11. OXI FREE

12. MAXELL IZUMI

13. SOLDAMATIC

400

The most recent proposal HPI offers to Academe? 

SDP (Strategic Development Plan)

400

NFCC

Net Financial Contracting Capacity

500

HPI was pivotal in bringing what Motor Vehicle company to the Philippines

Ford

500

School with the most recent MOA signing?

Lyceum of Aparri

500

What are the 3 key aspects on how to achieve 100% joint reliability goal

answer safety , quality and on-time schedule.

500

According to HPI's company policy, how many days is required in filing a scheduled Leave of Absence?

5 days


500

ISO

International Organization of Standardization