100
The 6 phases of iSAP Agile are:
What is Prepare, Foundation, BuildPrint, Test, Deploy, and Support?
100
Value Stream Mapping occurs in this phase.
What is Prepare?
100

Capgemini's pre-configured industry solutions are called this.

What are Path solutions?

100

Sprints last for this length of time

What is 2-4 weeks?

100

True or False: The Product Backlog cannot be changed through the course of the project.

What is FALSE?

200

What is needed for a project to be successful (besides BPE, Development and PMO)?

What are Data and OCM?

200

PRICEFW stands for:

What are Portals, Reports, Interfaces, Conversions, Enhancements, Forms, Workflows?

200

Master Data and Org Structure workshops are conducted in this phase.

What is Foundation?

200

This level plan is stored in Microsoft Project and gives more detail on deliverables per phase and stream.

What is the Level 3 plan?

200

Capgemini Data team uses what tools to load data?

BADI, BAPI, Load Template, Winshuttle 

300

In which phase of the project will you identify pain points and success criteria?

What is Prepare?

300

This plan details the steps for turning off legacy systems and turning on your new system.

What is the Cutover Plan?

300

The 8 wastes are:

What are: Defects, Overproduction, Waiting, Human Potential / Non-Utilized Talent, Transportation, Inventory, Motion, and Extra Processing?

300

The Agile process that iSAP Agile is based on to manage and control build is:

What is Scrum?

300

From a design and build perspective, the key difference between iSAP Waterfall and iSAP Agile is:

What is : iSAP Waterfall has all of its design at the beginning, whereas iSAP Agile breaks its design into cycles / sprints focused on certain functionality. (also would accept shorter test phase in iSAP Agile)

400

The three outputs from the Value Stream Mapping Session are:

What is the Functional Design Document (FDD), VSM map, and Product Backlog?

400

The Japanese term for error proofing (mistake proofing) is:

What is poka-yoke?

400

For it to be properly estimated, a user story needs to be feasible, testable, and independent. We can also say it must meet the definition of:

What is Ready?

400

True or False: What doc is required to configure  IMG nodes.

What is CR?

400

This team is responsible for the installation of new systems and migration of transports?

What is the Technical Infrastructure team (would accept Basis team)?

500

What does ETL stand for?

Extract, Load, Transform

500

After the Development team receives detail from the Business Process team on how to develop a PRICEFW object, they create this document:

What is the TSD (Technical Specification Document)?

500

What is DR?

Deal Review

500

When configuring, we document our results in this section of the DDF.

What is Section 7 - Key Design Decisions?

500

Gaps in system functionality can be addressed in two different ways:

What are 1. Business process changes, and 2. PRICEFW objects?