Capgemini's pre-configured industry solutions are called this.
What are Path solutions?
Sprints last for this length of time
What is 2-4 weeks?
True or False: The Product Backlog cannot be changed through the course of the project.
What is FALSE?
What is needed for a project to be successful (besides BPE, Development and PMO)?
What are Data and OCM?
PRICEFW stands for:
What are Portals, Reports, Interfaces, Conversions, Enhancements, Forms, Workflows?
Master Data and Org Structure workshops are conducted in this phase.
What is Foundation?
This level plan is stored in Microsoft Project and gives more detail on deliverables per phase and stream.
What is the Level 3 plan?
Capgemini Data team uses what tools to load data?
BADI, BAPI, Load Template, Winshuttle
In which phase of the project will you identify pain points and success criteria?
What is Prepare?
This plan details the steps for turning off legacy systems and turning on your new system.
What is the Cutover Plan?
The 8 wastes are:
What are: Defects, Overproduction, Waiting, Human Potential / Non-Utilized Talent, Transportation, Inventory, Motion, and Extra Processing?
The Agile process that iSAP Agile is based on to manage and control build is:
What is Scrum?
From a design and build perspective, the key difference between iSAP Waterfall and iSAP Agile is:
What is : iSAP Waterfall has all of its design at the beginning, whereas iSAP Agile breaks its design into cycles / sprints focused on certain functionality. (also would accept shorter test phase in iSAP Agile)
The three outputs from the Value Stream Mapping Session are:
What is the Functional Design Document (FDD), VSM map, and Product Backlog?
The Japanese term for error proofing (mistake proofing) is:
What is poka-yoke?
For it to be properly estimated, a user story needs to be feasible, testable, and independent. We can also say it must meet the definition of:
What is Ready?
True or False: What doc is required to configure IMG nodes.
What is CR?
This team is responsible for the installation of new systems and migration of transports?
What is the Technical Infrastructure team (would accept Basis team)?
What does ETL stand for?
Extract, Load, Transform
After the Development team receives detail from the Business Process team on how to develop a PRICEFW object, they create this document:
What is the TSD (Technical Specification Document)?
What is DR?
Deal Review
When configuring, we document our results in this section of the DDF.
What is Section 7 - Key Design Decisions?
Gaps in system functionality can be addressed in two different ways:
What are 1. Business process changes, and 2. PRICEFW objects?