Start/Closure Notices
Business Knowledge
WT/DE
Sampling/Testing
Validation/New Issues
200

These are the three parts that make up Business Unit Management.

What are the Control Attestor, Control Owner and Activity Owner?

200

This is the number of Business Days for Management to respond to a follow-up request.

What is 2 BDs?

200

This is the control type that can automatically use a Limited Walkthrough.

What are Enterprise Wide Controls (EWCs)?

200

This is the type of Sampling most commonly used during ICFR USBP Testing.

What is Random?

200

Findings are issued a rating of Critical High, Medium, Low and this.

What is High?

400

The issuer of the final Closure Notices.

Who is SOX OG?

400

These are the two CRA categories that trigger an automatic overall rating of High.

What are #8 - Control Intended to Prevent/Detect Fraud and #9 - Impact of Prior Year Findings?

400

This is the number of transactions that are documented during a standard WT.

What is 1?

400

This is the internal system used to obtain a random sample.

What is Alteryx?

400

This is the number of Calendar Days Management has to submit an Action Plan.

What is 30?

600

Scope period, estimated start date, estimated exit date and this are the required communications on a Start Notice.

What is the SOX control?

600
This is what must be done by the Tester when a CAP is returned with support.

What is Support Validation?

600

This is the conclusion for a control with proper design, but improvements are identified.

What is Effective?

600

When obtaining Q3/Q4 coverage, this uncommon type of sampling is permitted.

What is Judgmental?

600

This is the lowest level that can perform an L1 for a Finding Grid from the Current Year.

What is AM2 (or L10)?

800

All key stakeholders included on the Closure Notice are the same as Start Notices, except this, for High Risk Findings.

Who is the Business Unit SVP?

800

STOP: This must be used because the Line of Business is providing PII.

What is the FTP?

800

A control assessed at Low Risk, No PY findings, but a different team member at the same level is performing the control means this type of WT can be performed.

What is Limited?

800

This is the time period for Fiscal Q3.

What is May 1 - July 31?

800

Low Risk Findings can be closed via this, with approval from the ICFR AVP.

What is management's assertion?

1000

This is the amount of business days ICFR has to issue a start notice on a newly scoped in control.

What is no requirement?

1000

These are the Standards used to Design Test Scripts.

What are Operational Audit?

1000

This is the number of Control Design Evaluation Criteria.

What is 8?

1000

A high risk control performed ad hoc requires 21 samples and this many reperformance samples.

What is 5?

1000

Updating the scope or this can result in a SOX rating residual risk change.

What is Materiality?