The name of the installer who joined us to share their knowledge of footing experience in February's PM meeting.
Who is Craig Yeszin?
This early step in a sign's life cycle is the initiator of some cities needing a pre-assigned UL number.
What is permitting?
This is the first step to ensure a sign's flawless install.
What is a good survey?
These are the 3 names of employees who run the shipping department at IN.
Who are Steve/Dave/Garrett?
This may sound like a the process of laying a corpse to rest but is a actually a type of footer foundation.
What is Direct Burial?
A UL number has a 1:1 relationship with this entity in Epicor and provides manufacturing visibility in production to ensure a sign is correctly tagged with unique UL label(s).
What is an SO number and line?
The metal framing system that eliminates welding and drilling that can be used to hang our sign panels.
What is unistrut?
This color within the Scheduled Shipments Dashboard ship date field means attention is required.
What is red?
The first step for safe digging consists of notifying this number 2-3 days before starting.
What is 8-1-1?
This role is responsible for acquiring UL labels, filing them in the central location and communicating the numbers back to the requestor.
Who is the MFG Supervisor?
This needs to be taken into consideration when selecting fasteners for penetration.
What is the wall material or surface?
The Completed Shipments tab in the dashboard shows completed shipments for the last what number of days?
What is 5 days?
This foundation method has the most flexibility for uneven sites.
What is a pier foundation?
The "UL" in the certification solutions company stands for this.
What is Underwriters' Laboratories?
Seen here: these are installed on walls behind exterior letters to cover all electrical connectors.
What are wireway covers?
The Packing Slip field in the shipping dashboard can be opened with this other module to find tracking and truck driver details in the Header -> Comments tab.
What is Customer Shipment Tracker?